(Tuesday, Apr. 9 at 08:45)
Line 70: Line 70:
 
# Notes from the past 24 hours
 
# Notes from the past 24 hours
 
#* Beam studies during last day shift. Target emptied.
 
#* Beam studies during last day shift. Target emptied.
#* Collected ?M triggers on Empty target
+
#* Collected ~300M triggers on Empty target
 
# Issues
 
# Issues
 
#* Few FCAL basses have been replaced. Others showed up ([https://logbooks.jlab.org/entry/3677103 logbook entry 3677103])
 
#* Few FCAL basses have been replaced. Others showed up ([https://logbooks.jlab.org/entry/3677103 logbook entry 3677103])

Revision as of 06:29, 9 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB
    • Next RC meeting on Monday


Monday, Apr. 8 at 08:45

  1. Notes from the past 72 hours
    • Collected more than 4.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Controlled access during the day shift
    • Target emptying this morning.
    • Walkthrough at 11:00 am
    • Production running, 200nA, 10-4 Al on Empty target evening and owl shifts.
  5. Run Plan
    • Beam studies 8:30 - 15:30, beam restoration 15:30-16:30. No RF recovery planned for Tuesday.
    • End of run in 7 days
  6. AOB


Tuesday, Apr. 9 at 08:45

  1. Notes from the past 24 hours
    • Beam studies during last day shift. Target emptied.
    • Collected ~300M triggers on Empty target
  2. Issues
  3. Reports
  4. Today
    • Controlled access afternoon to fill target back
    • Production running, 200nA, 10-4 Al on Empty target before noon and full target afternoon.
  5. Run Plan
    • Still no RF recovery planned for today.
    • End of run in 6 days
  6. AOB