Difference between revisions of "Run Planning Meeting Notes, Apr 4 - Apr 10, 2019"

From GlueXWiki
Jump to: navigation, search
(Wednesday, Apr. 10 at 08:45)
(Wednesday, Apr. 10 at 08:45)
Line 91: Line 91:
 
== Wednesday, Apr. 10 at 08:45 ==
 
== Wednesday, Apr. 10 at 08:45 ==
 
# Notes from the past 24 hours
 
# Notes from the past 24 hours
#* Collected ~130M triggers on Empty target, 0.2B triggers on lHe target
+
#* Collected ~130M triggers on Empty target, 1B triggers on LHe target
 
#* Controlled access: target filling, FCAL bases replacement ([https://logbooks.jlab.org/entry/3677286] logbook entry 3677286), opportunistic walkthrough
 
#* Controlled access: target filling, FCAL bases replacement ([https://logbooks.jlab.org/entry/3677286] logbook entry 3677286), opportunistic walkthrough
 
#* prototype tests last evening
 
#* prototype tests last evening
Line 97: Line 97:
 
#*
 
#*
 
# Reports
 
# Reports
#*  
+
#*
 
# Today
 
# Today
#* Production running, 200nA, 10<sup>-4</sup> Al lHe target
+
#* Production running, 200nA, 10<sup>-4</sup> Al LHe target
 
# Run Plan
 
# Run Plan
 
#* End of run in 5 days
 
#* End of run in 5 days
 
# AOB
 
# AOB
 
#* Josh Crafts is the next run coordinator
 
#* Josh Crafts is the next run coordinator

Revision as of 06:41, 10 April 2019

Thursday, Apr. 4 at 08:45

  1. Notes from the past 24 hours
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday full 8 hrs. RF recovery if needed.
    • End of run in two weeks time...
  6. AOB

Friday, Apr. 5 at 08:45

  1. Notes from the past 24 hours
    • MCC reported issues with RF separators during the day shift (about 2 hours with no beam)
    • Collected more than 1.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al
  5. Run Plan
    • Beam studies on Monday, the whole day shift. RF recovery only if needed.
    • End of run in 10 days
  6. AOB
    • Next RC meeting on Monday


Monday, Apr. 8 at 08:45

  1. Notes from the past 72 hours
    • Collected more than 4.5B triggers on full target
  2. Issues
  3. Reports
  4. Today
    • Controlled access during the day shift
    • Target emptying this morning.
    • Walkthrough at 11:00 am
    • Production running, 200nA, 10-4 Al on Empty target evening and owl shifts.
  5. Run Plan
    • Beam studies 8:30 - 15:30, beam restoration 15:30-16:30. No RF recovery planned for Tuesday.
    • End of run in 7 days
  6. AOB


Tuesday, Apr. 9 at 08:45

  1. Notes from the past 24 hours
    • Beam studies during last day shift. Target emptied.
    • Collected ~300M triggers on Empty target
  2. Issues
  3. Reports
  4. Today
    • Controlled access afternoon to fill target back
    • Production running, 200nA, 10-4 Al on Empty target before noon and full target afternoon.
  5. Run Plan
    • No RF recovery planned for today.
    • End of run in 6 days
  6. AOB


Wednesday, Apr. 10 at 08:45

  1. Notes from the past 24 hours
    • Collected ~130M triggers on Empty target, 1B triggers on LHe target
    • Controlled access: target filling, FCAL bases replacement ([8] logbook entry 3677286), opportunistic walkthrough
    • prototype tests last evening
  2. Issues
  3. Reports
  4. Today
    • Production running, 200nA, 10-4 Al LHe target
  5. Run Plan
    • End of run in 5 days
  6. AOB
    • Josh Crafts is the next run coordinator