==Tuesday, April 12==
 +
 +
# Accelerator Status
 +
#* Beam went down at 7am for work in SL.
 +
#* Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
 +
#* Beam expected back sometime during swing shift
 +
# Hall-D/GlueX items
 +
#* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident]
 +
#* https://logbooks.jlab.org/entry/3397771
 +
#* Latest scans: [https://logbooks.jlab.org/entry/3397829 5C11,5C11B] , [https://logbooks.jlab.org/entry/3397842 Hall-D harp scan]
 +
#* other systems?
 +
# Run Plan
 +
#* Mode 8 run w/ Amorphous '''~1hr'''
 +
#* TRD runs '''~1hr''' (Lubomir, Sergey)
 +
#* Halo Linearity scan (Hovanes)
 +
#* Harp scan collection
 +
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit?usp=sharing Production running]
 +
#** [https://logbooks.jlab.org/entry/3393844 Parasitic quadrupole test]
 +
#** Parasitic DAQ livetime/RAID test
 +
# Offline analysis?
 +
# AOB?
 
==Monday, April 11==
 
==Monday, April 11==
  

Revision as of 07:59, 12 April 2016

Tuesday, April 12

  1. Accelerator Status
    • Beam went down at 7am for work in SL.
    • Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
    • Beam expected back sometime during swing shift
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?

Monday, April 11

  1. Accelerator Status
    • Beam went down at 7am for radcon survey of SL
    • Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
      • "... blind ..."
  2. Hall-D/GlueX items
  3. Run Plan
  4. Offline analysis?
  5. AOB?