Difference between revisions of "Run Planning Meeting Notes, April 19-April 18, 2016"
From GlueXWiki
(→Tuesday, April 19) |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 13: | Line 13: | ||
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
#* Hall D access Wednesday 20 April. | #* Hall D access Wednesday 20 April. | ||
− | #** Access possible throughout | + | #** Access possible throughout Day and into Swing, starting as soon as we can get an ARM. |
#** RadCon has been contacted. Collimator cave access from 10 am or earlier. | #** RadCon has been contacted. Collimator cave access from 10 am or earlier. | ||
#** Collimator work | #** Collimator work | ||
#** TRD work | #** TRD work | ||
#** Magnet work | #** Magnet work | ||
+ | #** FCAL bases exchange | ||
#* Empty Target run with 5 mm hole | #* Empty Target run with 5 mm hole | ||
#* TAGM alignment | #* TAGM alignment | ||
Line 23: | Line 24: | ||
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | #* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | ||
# Run Plan | # Run Plan | ||
− | |||
− | |||
− | |||
#* Production 50 um | #* Production 50 um | ||
+ | #* Trigger studies | ||
+ | #* TRD studies | ||
+ | #* Mode 8 (raw mode) running? | ||
+ | #* Para/Perp luminosity studies? | ||
# Offline Analysis? | # Offline Analysis? | ||
# Any Other Business? | # Any Other Business? |
Latest revision as of 11:54, 18 April 2016
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs
- Triggers
- Scheduled accelerator down on Wednesday 20 April.
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
- RadCon has been contacted. Collimator cave access from 10 am or earlier.
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Empty Target run with 5 mm hole
- TAGM alignment
- Latest Occupancy Plots
- Run Statistics
- Hall D access Wednesday 20 April.
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?
- Any Other Business?