Difference between revisions of "Run Planning Meeting Notes, April 19-April 18, 2016"

From GlueXWiki
Jump to: navigation, search
(Tuesday, April 19)
Line 13: Line 13:
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 
#* Hall D access Wednesday 20 April.
 
#* Hall D access Wednesday 20 April.
#** Access possible throughout day, starting as soon as we can get an ARM.
+
#** Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
 
#** RadCon has been contacted.  Collimator cave access from 10 am or earlier.
 
#** RadCon has been contacted.  Collimator cave access from 10 am or earlier.
 
#** Collimator work
 
#** Collimator work

Revision as of 11:53, 18 April 2016


Tuesday, April 19

  1. Accelerator Status
    • Running overnight
      • ABUs
      • Triggers
    • Scheduled accelerator down on Wednesday 20 April.
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Hall D access Wednesday 20 April.
      • Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
      • RadCon has been contacted. Collimator cave access from 10 am or earlier.
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Empty Target run with 5 mm hole
    • TAGM alignment
    • Latest Occupancy Plots
    • Run Statistics
  3. Run Plan
    • Para/Perp luminosity studies?
    • Trigger studies?
    • Mode 8 (raw mode) running?
    • Production 50 um
  4. Offline Analysis?
  5. Any Other Business?