Difference between revisions of "Run Planning Meeting Notes, April 19-April 18, 2016"

From GlueXWiki
Jump to: navigation, search
(Tuesday, April 19)
 
Line 24: Line 24:
 
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 
# Run Plan
 
# Run Plan
#* Para/Perp luminosity studies?
 
#* Trigger studies?
 
#* Mode 8 (raw mode) running?
 
 
#* Production 50 um
 
#* Production 50 um
 +
#* Trigger studies
 +
#* TRD studies
 +
#* Mode 8 (raw mode) running?
 +
#* Para/Perp luminosity studies?
 
# Offline Analysis?
 
# Offline Analysis?
 
# Any Other Business?
 
# Any Other Business?

Latest revision as of 11:54, 18 April 2016


Tuesday, April 19

  1. Accelerator Status
    • Running overnight
      • ABUs
      • Triggers
    • Scheduled accelerator down on Wednesday 20 April.
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Hall D access Wednesday 20 April.
      • Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
      • RadCon has been contacted. Collimator cave access from 10 am or earlier.
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Empty Target run with 5 mm hole
    • TAGM alignment
    • Latest Occupancy Plots
    • Run Statistics
  3. Run Plan
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Mode 8 (raw mode) running?
    • Para/Perp luminosity studies?
  4. Offline Analysis?
  5. Any Other Business?