Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"
From GlueXWiki
Line 8: | Line 8: | ||
#* Running overnight | #* Running overnight | ||
#** ABUs (309 + 328 + ??) | #** ABUs (309 + 328 + ??) | ||
− | #** Triggers () | + | #** Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M) |
#* Scheduled accelerator down on Wednesday 20 April. | #* Scheduled accelerator down on Wednesday 20 April. | ||
#** RF recovery, beam studies, Hall A pass change | #** RF recovery, beam studies, Hall A pass change |
Revision as of 07:23, 19 April 2016
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs (309 + 328 + ??)
- Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
- Scheduled accelerator down on Wednesday 20 April.
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
- RadCon has been contacted. Collimator cave access from 10 am or earlier.
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Empty Target run with 5 mm hole
- TAGM alignment
- Latest Occupancy Plots
- Run Statistics
- Hall D access Wednesday 20 April.
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?
- Any Other Business?