Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"

From GlueXWiki
Jump to: navigation, search
Line 15: Line 15:
 
#* Report on TRD studies
 
#* Report on TRD studies
 
#* Hall D access Wednesday 20 April.
 
#* Hall D access Wednesday 20 April.
#** Access possible throughout Day and into Swing, starting as soon as we can get an ARM.
+
#** Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
#** RadCon has been contacted. Collimator cave access from 10 am or earlier.
+
#** No tagger access required???
 
#** Collimator work
 
#** Collimator work
 
#** TRD work
 
#** TRD work
 
#** Magnet work
 
#** Magnet work
 
#** FCAL bases exchange
 
#** FCAL bases exchange
#* Empty Target run with 5 mm hole (Thursday ?)
+
#* [https://logbooks.jlab.org/entry/3400395 Latest Occupancy Plots] look reasonable
#* TAGM alignment (Thursday ?)
+
#* [https://logbooks.jlab.org/entry/3400181 Latest Occupancy Plots]
+
 
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 
# Run Plan
 
# Run Plan
Line 29: Line 27:
 
#* Trigger studies
 
#* Trigger studies
 
#* TRD studies
 
#* TRD studies
 +
#* Empty Target run with 5 mm hole (Thursday ?)
 +
#* TAGM alignment (Thursday ?)
 
#* Mode 8 (raw mode) running?
 
#* Mode 8 (raw mode) running?
 
#* Para/Perp luminosity studies?
 
#* Para/Perp luminosity studies?
 
# Offline Analysis?
 
# Offline Analysis?
 
# Any Other Business?
 
# Any Other Business?

Revision as of 08:34, 19 April 2016

Tuesday, April 19

  1. Accelerator Status
    • Running overnight
      • ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
      • Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
    • Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Report on Trigger studies
    • Report on TRD studies
    • Hall D access Wednesday 20 April.
      • Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
      • No tagger access required???
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Latest Occupancy Plots look reasonable
    • Run Statistics
  3. Run Plan
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Empty Target run with 5 mm hole (Thursday ?)
    • TAGM alignment (Thursday ?)
    • Mode 8 (raw mode) running?
    • Para/Perp luminosity studies?
  4. Offline Analysis?
  5. Any Other Business?