Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(35 intermediate revisions by 5 users not shown)
Line 1: Line 1:
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Schedule]
+
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York View Runplan google calendar]
* [http://calendar.google.com Google Calendar]
+
* [http://calendar.google.com Edit Runplan google calendar]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
 
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board]
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
+
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Spreadsheet: number of triggers]
 +
 
 +
 
 +
==Monday, April 25==
 +
# Accelerator Status
 +
# Hall-D/GlueX items
 +
#*  Running overnight
 +
#** ABUs 16.9 hours in 3 shifts
 +
#*** 307 mins day, 403 mins swing, 304 mins owl
 +
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Triggers] (PARA 450 M trigs, PERP 640 M trigs, unpolarized 326 M trigs)
 +
#**[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2994 Run Statistics]
 +
#*** Total at 1345 A:  4 G trigs at  (15 % of total)
 +
#* Trigger studies
 +
#** 5 runs (470 M trigs) which also include new trigger
 +
# Access to Hall
 +
#** Controlled access Monday
 +
#** Administrative controls through Thursday
 +
# Offline Analysis?
 +
#* [https://logbooks.jlab.org/entry/3402819 Event parsing speed]
 +
#* [https://logbooks.jlab.org/entry/3402778 Higher width in PERP]
 +
#* [https://logbooks.jlab.org/entry/3402982 Beam bleed-through from FFT of event data]
 +
# Any Other Business?
 +
 
 +
==Sunday, April 24==
 +
# Accelerator Status
 +
#*  Beam gone most of Day Shift, back at about 6 pm.
 +
# Hall-D/GlueX items
 +
#*  Running overnight
 +
#** ABUs 10.4 hours in 3 shifts
 +
#*** 55 mins day, 202 mins swing, 366 mins owl
 +
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Triggers] (PARA 342 M trigs, PERP 299 M trigs)
 +
#* mode 8 current scan
 +
#* [https://logbooks.jlab.org/entry/3402377 Beam profiler survey]
 +
#* Trigger studies (2 hours)
 +
#** 2 runs which also include new trigger
 +
#* [https://logbooks.jlab.org/entry/3402661 TAGM alignment initial results]
 +
# Upcoming Run Plan
 +
#* Production 50 um
 +
# Offline Analysis?
 +
#* [https://logbooks.jlab.org/entry/3402469 some histos for run 11638 ]
 +
#* [https://logbooks.jlab.org/entry/3402477 very rough cross section estimates for rho production from run 11450]
 +
# Any Other Business?
 +
 
 +
==Saturday, April 23==
 +
# Accelerator Status
 +
#*  Beam gone for various reasons Friday afternoon. Came back ~19:30
 +
# Hall-D/GlueX items
 +
#*  Running overnight
 +
#** ABUs
 +
#*** >3hrs swing
 +
#*** >6hrs owl
 +
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Triggers]
 +
#** Online Monitoring
 +
#*** [https://logbooks.jlab.org/entry/3402228 Good] (all pages cycled through prior to hitting "Make elog entry")
 +
#*** [https://logbooks.jlab.org/entry/3402264 Bad]
 +
#* Microscope alignment data taking
 +
#* Empty Target run
 +
#* Trigger studies
 +
# Upcoming Run Plan
 +
#* Mode 8 (raw mode) running for Lubomir
 +
#* Production 50 um
 +
# Offline Analysis?
 +
# Any Other Business?
 +
 
 +
 
 +
==Friday, April 22==
 +
# Accelerator Status
 +
#*  Running smoothly
 +
# Hall-D/GlueX items
 +
#*  Running overnight
 +
#** ABUs 15.6 hours in 3 shifts, 65% (280 mins Day, 324 mins Swing, 334 mins Owl)
 +
#** Triggers  (PARA 473M trigs, PERP 303 M trigs, unpolarizad 130 M trigs)
 +
#*[https://logbooks.jlab.org/entry/3401526 Magnet ramped to 1350]
 +
#* [https://logbooks.jlab.org/entry/3401645 Centered on Active Collimator]
 +
#* new DAC values for BCAL, FCAL, CDC
 +
#* We are running PARA 80 nA and PERP 120 nA in order to get 30 kHz of rate.  Do we want to go higher?
 +
#* Monitoring logbook sometime missing plots [https://logbooks.jlab.org/entry/3401790 eg1] [https://logbooks.jlab.org/entry/3401765 eg2]
 +
#* Microscope gain have been balanced
 +
#** [https://logbooks.jlab.org/entry/3401549 Coherent edge much more cleanly visible and less raggedy]
 +
#** [https://logbooks.jlab.org/entry/3401680 need new template for enhancement]
 +
#*  [https://logbooks.jlab.org/entry/3401674 PS harp scan with 5mm hole]
 +
#* Trigger studies (3 hours)
 +
#* Report on TRD studies
 +
#* [https://logbooks.jlab.org/entry/3401472 MO prescale factor issues]
 +
# Run Plan
 +
#* Production 50 um
 +
#* Empty Target run with 5 mm hole (Friday ?)
 +
#* TAGM alignment (Friday ?)
 +
#* Mode 8 (raw mode) running ??
 +
# Offline Analysis?
 +
#* [https://logbooks.jlab.org/entry/3401754 Comparison of expected and measured yields for rho and pi0 production]
 +
# Any Other Business?
 +
 
 +
==Thursday, April 21==
 +
# Accelerator Status
 +
#*  Running smoothly, harps scan a little bit larger
 +
# Hall-D/GlueX items
 +
#*  Running overnight
 +
#** ABUs 7.8 hours in 3 shifts
 +
#** Triggers  (PARA 150M trigs, PERP 150 M trigs, unpolarizad 120 M trigs)
 +
#**  [https://logbooks.jlab.org/entry/3401353 TRD studies]
 +
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 +
#* Hall D access Wednesday 20 April.
 +
#** [https://logbooks.jlab.org/entry/3401112 Limit switches jumpered on the collimator stage]
 +
#** [https://logbooks.jlab.org/entry/3401118 BPU Al converter removed]
 +
#** [https://logbooks.jlab.org/entry/3401093 TRD shielding plate removed.]
 +
#** [https://logbooks.jlab.org/entry/3401120 active collimator has been moved to the 5mm hole]
 +
#** [https://logbooks.jlab.org/entry/3401063 Preparations for 1350 Amp run of Solenoid completed]
 +
#** [https://logbooks.jlab.org/entry/3401184 FCAL bases replaced]
 +
#* Microscope gain balancing (has this been implemented??)
 +
#* Report on TRD studies [https://logbooks.jlab.org/entry/3401353 TRD runs]
 +
# Run Plan
 +
#*  PS harp scan with 5mm hole during magnet ramp
 +
#* Trigger studies
 +
#* Empty Target run with 5 mm hole (Friday ?)
 +
#* TAGM alignment (Friday ?)
 +
#* Production 50 um
 +
#* Mode 8 (raw mode) running
 +
# Offline Analysis?
 +
# Any Other Business?
  
 
==Wednesday, April 20==
 
==Wednesday, April 20==
Line 13: Line 132:
 
#** ABUs 14.8 hours in 3 shifts  (day 371 mins, Swing 320 mins, owl 200 mins)
 
#** ABUs 14.8 hours in 3 shifts  (day 371 mins, Swing 320 mins, owl 200 mins)
 
#** Triggers  (PARA 354M trigs, PERP 375 M trigs)
 
#** Triggers  (PARA 354M trigs, PERP 375 M trigs)
 +
#** High luminosity tests (30 minutes), trigger studies (4 hours)
 
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 
#* Hall D access Wednesday 20 April.
 
#* Hall D access Wednesday 20 April.
Line 27: Line 147:
 
#* Report on TRD studies
 
#* Report on TRD studies
 
#* [https://logbooks.jlab.org/entry/3400395 Latest Occupancy Plots] look reasonable??
 
#* [https://logbooks.jlab.org/entry/3400395 Latest Occupancy Plots] look reasonable??
 +
#* [https://docs.google.com/presentation/d/1g6hQTz-uuszulTDp8qAhT6BdhZGJnPQwXfTxyk38DBE/edit?usp=sharing "20 micron" diamond radiator thicknesses]
 
# Run Plan
 
# Run Plan
 
#* Mode 8 (raw mode) running with cosmics during access
 
#* Mode 8 (raw mode) running with cosmics during access
Line 34: Line 155:
 
#* Empty Target run with 5 mm hole (Friday ?)
 
#* Empty Target run with 5 mm hole (Friday ?)
 
#* TAGM alignment (Friday ?)
 
#* TAGM alignment (Friday ?)
 +
#*  PS harp scan with 5mm hole
 
# Offline Analysis?
 
# Offline Analysis?
 
# Any Other Business?
 
# Any Other Business?
 
  
 
==Tuesday, April 19==
 
==Tuesday, April 19==

Latest revision as of 17:13, 24 February 2017


Monday, April 25

  1. Accelerator Status
  2. Hall-D/GlueX items
    • Running overnight
      • ABUs 16.9 hours in 3 shifts
        • 307 mins day, 403 mins swing, 304 mins owl
      • Triggers (PARA 450 M trigs, PERP 640 M trigs, unpolarized 326 M trigs)
      • Run Statistics
        • Total at 1345 A: 4 G trigs at (15 % of total)
    • Trigger studies
      • 5 runs (470 M trigs) which also include new trigger
  3. Access to Hall
      • Controlled access Monday
      • Administrative controls through Thursday
  4. Offline Analysis?
  5. Any Other Business?

Sunday, April 24

  1. Accelerator Status
    • Beam gone most of Day Shift, back at about 6 pm.
  2. Hall-D/GlueX items
  3. Upcoming Run Plan
    • Production 50 um
  4. Offline Analysis?
  5. Any Other Business?

Saturday, April 23

  1. Accelerator Status
    • Beam gone for various reasons Friday afternoon. Came back ~19:30
  2. Hall-D/GlueX items
    • Running overnight
      • ABUs
        • >3hrs swing
        • >6hrs owl
      • Triggers
      • Online Monitoring
        • Good (all pages cycled through prior to hitting "Make elog entry")
        • Bad
    • Microscope alignment data taking
    • Empty Target run
    • Trigger studies
  3. Upcoming Run Plan
    • Mode 8 (raw mode) running for Lubomir
    • Production 50 um
  4. Offline Analysis?
  5. Any Other Business?


Friday, April 22

  1. Accelerator Status
    • Running smoothly
  2. Hall-D/GlueX items
  3. Run Plan
    • Production 50 um
    • Empty Target run with 5 mm hole (Friday ?)
    • TAGM alignment (Friday ?)
    • Mode 8 (raw mode) running ??
  4. Offline Analysis?
  5. Any Other Business?

Thursday, April 21

  1. Accelerator Status
    • Running smoothly, harps scan a little bit larger
  2. Hall-D/GlueX items
  3. Run Plan
    • PS harp scan with 5mm hole during magnet ramp
    • Trigger studies
    • Empty Target run with 5 mm hole (Friday ?)
    • TAGM alignment (Friday ?)
    • Production 50 um
    • Mode 8 (raw mode) running
  4. Offline Analysis?
  5. Any Other Business?

Wednesday, April 20

  1. Accelerator Status
    • Overnight running (reasonably good, lost time for orbit issues due to the Hall A beam and ion chamber issues in the north linac.
    • Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Running overnight
      • ABUs 14.8 hours in 3 shifts (day 371 mins, Swing 320 mins, owl 200 mins)
      • Triggers (PARA 354M trigs, PERP 375 M trigs)
      • High luminosity tests (30 minutes), trigger studies (4 hours)
      • Run Statistics
    • Hall D access Wednesday 20 April.
      • RadCon has been contacted.
      • Access possible in the morning
      • Beam studies in the afternoon (upstream slow locks)
      • Walkthrough (Hall and Tagger)
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Microscope gain balancing
    • Report on Trigger studies
    • Report on TRD studies
    • Latest Occupancy Plots look reasonable??
    • "20 micron" diamond radiator thicknesses
  3. Run Plan
    • Mode 8 (raw mode) running with cosmics during access
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Empty Target run with 5 mm hole (Friday ?)
    • TAGM alignment (Friday ?)
    • PS harp scan with 5mm hole
  4. Offline Analysis?
  5. Any Other Business?

Tuesday, April 19

  1. Accelerator Status
    • Running overnight
      • ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
      • Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
    • Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Report on Trigger studies
    • Report on TRD studies
    • Hall D access Wednesday 20 April.
      • Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
      • No tagger access required???
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Latest Occupancy Plots look reasonable
    • Run Statistics
  3. Run Plan
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Empty Target run with 5 mm hole (Thursday ?)
    • TAGM alignment (Thursday ?)
    • Mode 8 (raw mode) running?
    • Para/Perp luminosity studies?
  4. Offline Analysis?
  5. Any Other Business?