Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"

From GlueXWiki
Jump to: navigation, search
(Monday, April 25)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(2 intermediate revisions by 2 users not shown)
Line 12: Line 12:
 
#*** 307 mins day, 403 mins swing, 304 mins owl
 
#*** 307 mins day, 403 mins swing, 304 mins owl
 
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Triggers] (PARA 450 M trigs, PERP 640 M trigs, unpolarized 326 M trigs)
 
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Triggers] (PARA 450 M trigs, PERP 640 M trigs, unpolarized 326 M trigs)
#**[http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2994 Run Statistics]
+
#**[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2994 Run Statistics]
 
#*** Total at 1345 A:  4 G trigs at  (15 % of total)
 
#*** Total at 1345 A:  4 G trigs at  (15 % of total)
 
#* Trigger studies
 
#* Trigger studies
 
#** 5 runs (470 M trigs) which also include new trigger
 
#** 5 runs (470 M trigs) which also include new trigger
 
# Access to Hall
 
# Access to Hall
#** Controlled access??
+
#** Controlled access Monday
#** Administrative controls??
+
#** Administrative controls through Thursday
 
# Offline Analysis?
 
# Offline Analysis?
 
#* [https://logbooks.jlab.org/entry/3402819 Event parsing speed]
 
#* [https://logbooks.jlab.org/entry/3402819 Event parsing speed]
 
#* [https://logbooks.jlab.org/entry/3402778 Higher width in PERP]
 
#* [https://logbooks.jlab.org/entry/3402778 Higher width in PERP]
 +
#* [https://logbooks.jlab.org/entry/3402982 Beam bleed-through from FFT of event data]
 
# Any Other Business?
 
# Any Other Business?
  

Latest revision as of 17:13, 24 February 2017


Monday, April 25

  1. Accelerator Status
  2. Hall-D/GlueX items
    • Running overnight
      • ABUs 16.9 hours in 3 shifts
        • 307 mins day, 403 mins swing, 304 mins owl
      • Triggers (PARA 450 M trigs, PERP 640 M trigs, unpolarized 326 M trigs)
      • Run Statistics
        • Total at 1345 A: 4 G trigs at (15 % of total)
    • Trigger studies
      • 5 runs (470 M trigs) which also include new trigger
  3. Access to Hall
      • Controlled access Monday
      • Administrative controls through Thursday
  4. Offline Analysis?
  5. Any Other Business?

Sunday, April 24

  1. Accelerator Status
    • Beam gone most of Day Shift, back at about 6 pm.
  2. Hall-D/GlueX items
  3. Upcoming Run Plan
    • Production 50 um
  4. Offline Analysis?
  5. Any Other Business?

Saturday, April 23

  1. Accelerator Status
    • Beam gone for various reasons Friday afternoon. Came back ~19:30
  2. Hall-D/GlueX items
    • Running overnight
      • ABUs
        • >3hrs swing
        • >6hrs owl
      • Triggers
      • Online Monitoring
        • Good (all pages cycled through prior to hitting "Make elog entry")
        • Bad
    • Microscope alignment data taking
    • Empty Target run
    • Trigger studies
  3. Upcoming Run Plan
    • Mode 8 (raw mode) running for Lubomir
    • Production 50 um
  4. Offline Analysis?
  5. Any Other Business?


Friday, April 22

  1. Accelerator Status
    • Running smoothly
  2. Hall-D/GlueX items
  3. Run Plan
    • Production 50 um
    • Empty Target run with 5 mm hole (Friday ?)
    • TAGM alignment (Friday ?)
    • Mode 8 (raw mode) running ??
  4. Offline Analysis?
  5. Any Other Business?

Thursday, April 21

  1. Accelerator Status
    • Running smoothly, harps scan a little bit larger
  2. Hall-D/GlueX items
  3. Run Plan
    • PS harp scan with 5mm hole during magnet ramp
    • Trigger studies
    • Empty Target run with 5 mm hole (Friday ?)
    • TAGM alignment (Friday ?)
    • Production 50 um
    • Mode 8 (raw mode) running
  4. Offline Analysis?
  5. Any Other Business?

Wednesday, April 20

  1. Accelerator Status
    • Overnight running (reasonably good, lost time for orbit issues due to the Hall A beam and ion chamber issues in the north linac.
    • Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Running overnight
      • ABUs 14.8 hours in 3 shifts (day 371 mins, Swing 320 mins, owl 200 mins)
      • Triggers (PARA 354M trigs, PERP 375 M trigs)
      • High luminosity tests (30 minutes), trigger studies (4 hours)
      • Run Statistics
    • Hall D access Wednesday 20 April.
      • RadCon has been contacted.
      • Access possible in the morning
      • Beam studies in the afternoon (upstream slow locks)
      • Walkthrough (Hall and Tagger)
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Microscope gain balancing
    • Report on Trigger studies
    • Report on TRD studies
    • Latest Occupancy Plots look reasonable??
    • "20 micron" diamond radiator thicknesses
  3. Run Plan
    • Mode 8 (raw mode) running with cosmics during access
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Empty Target run with 5 mm hole (Friday ?)
    • TAGM alignment (Friday ?)
    • PS harp scan with 5mm hole
  4. Offline Analysis?
  5. Any Other Business?

Tuesday, April 19

  1. Accelerator Status
    • Running overnight
      • ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
      • Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
    • Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Report on Trigger studies
    • Report on TRD studies
    • Hall D access Wednesday 20 April.
      • Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
      • No tagger access required???
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Latest Occupancy Plots look reasonable
    • Run Statistics
  3. Run Plan
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Empty Target run with 5 mm hole (Thursday ?)
    • TAGM alignment (Thursday ?)
    • Mode 8 (raw mode) running?
    • Para/Perp luminosity studies?
  4. Offline Analysis?
  5. Any Other Business?