Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"
From GlueXWiki
Line 3: | Line 3: | ||
* [https://cebaf.jlab.org/files/ops/accboard/ MCC white board] | * [https://cebaf.jlab.org/files/ops/accboard/ MCC white board] | ||
* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | * [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | ||
+ | |||
+ | ==Wednesday, April 20== | ||
+ | # Accelerator Status | ||
+ | #* Overnight running??? | ||
+ | #* Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm) | ||
+ | #** RF recovery, beam studies, Hall A pass change | ||
+ | # Hall-D/GlueX items | ||
+ | #* Running overnight | ||
+ | #** ABUs | ||
+ | #** Triggers | ||
+ | #** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | ||
+ | #* Hall D access Wednesday 20 April. | ||
+ | #** RadCon has been contacted. | ||
+ | #** Access possible in the morning | ||
+ | #** Beam studies in the afternoon (upstream slow locks) | ||
+ | #** Walkthrough (Hall and Tagger) | ||
+ | #** Collimator work | ||
+ | #** TRD work | ||
+ | #** Magnet work | ||
+ | #** FCAL bases exchange | ||
+ | #* Report on Trigger studies | ||
+ | #* Report on TRD studies | ||
+ | #* [https://logbooks.jlab.org/entry/3400395 Latest Occupancy Plots] look reasonable?? | ||
+ | # Run Plan | ||
+ | #* Production 50 um | ||
+ | #* Trigger studies | ||
+ | #* TRD studies | ||
+ | #* Empty Target run with 5 mm hole (Friday ?) | ||
+ | #* TAGM alignment (Friday ?) | ||
+ | #* Deferred | ||
+ | #** Mode 8 (raw mode) running | ||
+ | # Offline Analysis? | ||
+ | # Any Other Business? | ||
+ | |||
+ | |||
==Tuesday, April 19== | ==Tuesday, April 19== |
Revision as of 12:51, 19 April 2016
Wednesday, April 20
- Accelerator Status
- Overnight running???
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Hall-D/GlueX items
- Running overnight
- ABUs
- Triggers
- Run Statistics
- Hall D access Wednesday 20 April.
- RadCon has been contacted.
- Access possible in the morning
- Beam studies in the afternoon (upstream slow locks)
- Walkthrough (Hall and Tagger)
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Report on Trigger studies
- Report on TRD studies
- Latest Occupancy Plots look reasonable??
- Running overnight
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Friday ?)
- TAGM alignment (Friday ?)
- Deferred
- Mode 8 (raw mode) running
- Offline Analysis?
- Any Other Business?
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
- Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Report on Trigger studies
- Report on TRD studies
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
- No tagger access required???
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Latest Occupancy Plots look reasonable
- Run Statistics
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Thursday ?)
- TAGM alignment (Thursday ?)
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?
- Any Other Business?