Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"
From GlueXWiki
Line 15: | Line 15: | ||
#* Report on TRD studies | #* Report on TRD studies | ||
#* Hall D access Wednesday 20 April. | #* Hall D access Wednesday 20 April. | ||
− | #** Access possible throughout Day and into Swing, starting | + | #** Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted. |
− | + | #** No tagger access required??? | |
#** Collimator work | #** Collimator work | ||
#** TRD work | #** TRD work | ||
#** Magnet work | #** Magnet work | ||
#** FCAL bases exchange | #** FCAL bases exchange | ||
− | + | #* [https://logbooks.jlab.org/entry/3400395 Latest Occupancy Plots] look reasonable | |
− | + | ||
− | #* [https://logbooks.jlab.org/entry/ | + | |
#* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | #* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics] | ||
# Run Plan | # Run Plan | ||
Line 29: | Line 27: | ||
#* Trigger studies | #* Trigger studies | ||
#* TRD studies | #* TRD studies | ||
+ | #* Empty Target run with 5 mm hole (Thursday ?) | ||
+ | #* TAGM alignment (Thursday ?) | ||
#* Mode 8 (raw mode) running? | #* Mode 8 (raw mode) running? | ||
#* Para/Perp luminosity studies? | #* Para/Perp luminosity studies? | ||
# Offline Analysis? | # Offline Analysis? | ||
# Any Other Business? | # Any Other Business? |
Revision as of 08:34, 19 April 2016
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
- Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Report on Trigger studies
- Report on TRD studies
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
- No tagger access required???
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Latest Occupancy Plots look reasonable
- Run Statistics
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Thursday ?)
- TAGM alignment (Thursday ?)
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?
- Any Other Business?