Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
==Wednesday, April 20==
 
==Wednesday, April 20==
 
# Accelerator Status
 
# Accelerator Status
#*  Overnight running???
+
#*  Overnight running (reasonably good, lost time for orbit issues due to the Hall A beam and ion chamber issues in the north linac.
 
#*  Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
 
#*  Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
 
#** RF recovery, beam studies, Hall A pass change
 
#** RF recovery, beam studies, Hall A pass change
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 
#*  Running overnight
 
#*  Running overnight
#** ABUs  
+
#** ABUs 14.8 hours in 3 shifts  (day 371 mins, Swing 320 mins, owl 200 mins)
#** Triggers  
+
#** Triggers (PARA 354M trigs, PERP 375 M trigs)
 
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 
#** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Run Statistics]
 
#* Hall D access Wednesday 20 April.
 
#* Hall D access Wednesday 20 April.

Revision as of 08:40, 20 April 2016

Wednesday, April 20

  1. Accelerator Status
    • Overnight running (reasonably good, lost time for orbit issues due to the Hall A beam and ion chamber issues in the north linac.
    • Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Running overnight
      • ABUs 14.8 hours in 3 shifts (day 371 mins, Swing 320 mins, owl 200 mins)
      • Triggers (PARA 354M trigs, PERP 375 M trigs)
      • Run Statistics
    • Hall D access Wednesday 20 April.
      • RadCon has been contacted.
      • Access possible in the morning
      • Beam studies in the afternoon (upstream slow locks)
      • Walkthrough (Hall and Tagger)
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Microscope gain balancing
    • Report on Trigger studies
    • Report on TRD studies
    • Latest Occupancy Plots look reasonable??
  3. Run Plan
    • Mode 8 (raw mode) running with cosmics during access
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Empty Target run with 5 mm hole (Friday ?)
    • TAGM alignment (Friday ?)
  4. Offline Analysis?
  5. Any Other Business?


Tuesday, April 19

  1. Accelerator Status
    • Running overnight
      • ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
      • Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
    • Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
      • RF recovery, beam studies, Hall A pass change
  2. Hall-D/GlueX items
    • Report on Trigger studies
    • Report on TRD studies
    • Hall D access Wednesday 20 April.
      • Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
      • No tagger access required???
      • Collimator work
      • TRD work
      • Magnet work
      • FCAL bases exchange
    • Latest Occupancy Plots look reasonable
    • Run Statistics
  3. Run Plan
    • Production 50 um
    • Trigger studies
    • TRD studies
    • Empty Target run with 5 mm hole (Thursday ?)
    • TAGM alignment (Thursday ?)
    • Mode 8 (raw mode) running?
    • Para/Perp luminosity studies?
  4. Offline Analysis?
  5. Any Other Business?