(Created page with "==Sunday, April 3== # Accelerator Status ## Beam gone until ~2am Saturday ## Frequent RF trips, [https://logbooks.jlab.org/entry/3394395 poor profile scans], [https://logbook...")
 
(Sunday, April 3)
Line 2: Line 2:
  
 
# Accelerator Status
 
# Accelerator Status
## Beam gone until ~2am Saturday
+
## Beam was gone until ~2am Saturday April 2
 
## Frequent RF trips, [https://logbooks.jlab.org/entry/3394395 poor profile scans], [https://logbooks.jlab.org/entry/3394348 poor enhancement]
 
## Frequent RF trips, [https://logbooks.jlab.org/entry/3394395 poor profile scans], [https://logbooks.jlab.org/entry/3394348 poor enhancement]
 
## Spotty or unacceptably poor beam from 13:00 Saturday to 3:30 Sunday (Issues with bleedthrough from other halls (?))
 
## Spotty or unacceptably poor beam from 13:00 Saturday to 3:30 Sunday (Issues with bleedthrough from other halls (?))
Line 17: Line 17:
 
## other systems?
 
## other systems?
 
# Run Plan
 
# Run Plan
## <s>empty target run</s>
+
## <strike>empty target run</strike>
 
## PS magnet current studies
 
## PS magnet current studies
 
## TRD run
 
## TRD run

Revision as of 09:42, 3 April 2016

Sunday, April 3

  1. Accelerator Status
    1. Beam was gone until ~2am Saturday April 2
    2. Frequent RF trips, poor profile scans, poor enhancement
    3. Spotty or unacceptably poor beam from 13:00 Saturday to 3:30 Sunday (Issues with bleedthrough from other halls (?))
    4. Improved beam profile
    5. Hall A gets priority Monday
  2. Hall-D/GlueX items
    1. Completed empty target run with amorphous radiator
    2. Difficulty getting consistent PARA and PERP at same location on JD70-118. Switch to JD70-119.
    3. CDC HV trips frequently
    4. beam intensity fluctuations
    5. tagger harp scan shows sigma_x = 0.9 mm, sigma_y = 1.1 mm, possibly better focusing on collimator
      • Hovanes suggests regular harp scans, including two ACC harps in D beamline, MCC must do those
    6. Shift-takers run comments: Discussion deferred
    7. other systems?
  3. Run Plan
    1. empty target run
    2. PS magnet current studies
    3. TRD run
    4. Satellite peak study (move beam)
    5. Microscope alignment (Alex B.)
    6. production running
  4. Offline analysis?
  5. AOB?