+ | ==Monday, April 4== | ||
+ | |||
+ | # Accelerator Status | ||
+ | ## No beam or poorly positioned beam until ~3:30am Sunday April 3 | ||
+ | ## [https://logbooks.jlab.org/entry/3394922 Bleedthrough from Hall-A] | ||
+ | ## Hall A gets priority Today | ||
+ | # Hall-D/GlueX items | ||
+ | ## Completed empty target run with amorphous radiator | ||
+ | ## Difficulty getting consistent PARA and PERP at same location on JD70-118. Switch to JD70-119. | ||
+ | ## CDC HV trips frequently. Current trip levels had inadvertently been reduced to 2uA (fixed) | ||
+ | ## beam intensity fluctuations | ||
+ | ##* Hovanes suggests regular harp scans, including two ACC harps in D beamline, MCC must do those | ||
+ | ## other systems? | ||
+ | # Run Plan | ||
+ | ## <strike>empty target run</strike> | ||
+ | ## <strike>Satellite peak study (move beam)</strike> | ||
+ | ## PS magnet current studies | ||
+ | ## TRD run | ||
+ | ## Microscope alignment (Alex B.) | ||
+ | ## production running | ||
+ | # Offline analysis? | ||
+ | # AOB? | ||
+ | |||
==Sunday, April 3== | ==Sunday, April 3== | ||
Line 8: | Line 31: | ||
## Hall A gets priority Monday | ## Hall A gets priority Monday | ||
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
− | ## Completed empty target run with | + | ## Completed empty target run with both PARA and PERP orientations |
## Difficulty getting consistent PARA and PERP at same location on JD70-118. Switch to JD70-119. | ## Difficulty getting consistent PARA and PERP at same location on JD70-118. Switch to JD70-119. | ||
## CDC HV trips frequently | ## CDC HV trips frequently |
Revision as of 07:29, 4 April 2016
Monday, April 4
- Accelerator Status
- No beam or poorly positioned beam until ~3:30am Sunday April 3
- Bleedthrough from Hall-A
- Hall A gets priority Today
- Hall-D/GlueX items
- Completed empty target run with amorphous radiator
- Difficulty getting consistent PARA and PERP at same location on JD70-118. Switch to JD70-119.
- CDC HV trips frequently. Current trip levels had inadvertently been reduced to 2uA (fixed)
- beam intensity fluctuations
- Hovanes suggests regular harp scans, including two ACC harps in D beamline, MCC must do those
- other systems?
- Run Plan
-
empty target run -
Satellite peak study (move beam) - PS magnet current studies
- TRD run
- Microscope alignment (Alex B.)
- production running
-
- Offline analysis?
- AOB?
Sunday, April 3
- Accelerator Status
- Beam was gone until ~2am Saturday April 2
- Frequent RF trips, poor profile scans, poor enhancement
- Spotty or unacceptably poor beam from 13:00 Saturday to 3:30 Sunday (Issues with bleedthrough from other halls (?))
- Improved beam profile
- Hall A gets priority Monday
- Hall-D/GlueX items
- Completed empty target run with both PARA and PERP orientations
- Difficulty getting consistent PARA and PERP at same location on JD70-118. Switch to JD70-119.
- CDC HV trips frequently
- beam intensity fluctuations
- tagger harp scan shows sigma_x = 0.9 mm, sigma_y = 1.1 mm, possibly better focusing on collimator
- Hovanes suggests regular harp scans, including two ACC harps in D beamline, MCC must do those
- Shift-takers run comments: Discussion deferred
- other systems?
- Run Plan
-
empty target run - PS magnet current studies
- TRD run
- Satellite peak study (move beam)
- Microscope alignment (Alex B.)
- production running
-
- Offline analysis?
- AOB?