==Friday, April 8==
 
==Friday, April 8==

Revision as of 09:45, 9 April 2016

Saturday, April 9

  1. Accelerator Status
    1. Latest scans: 5C11,5C11B , Hall-D harp scan
    2. 3 Hall operation. Mon. 6am Hall-B goes down. 7am Halls A and D go down.
    3. Beam estimated to be back Monday 10am with Hall-D as priority hall
    4. Virtual electron beam spot on collimator
    5. Power outage took out ESR which took out cryo to Hall-A target etc. (will be recovering most of today)
    6. Hall-B becomes priority starting at 3pm, but accelerator will be tuning to dumplette beforehand in preparation
  2. Hall-D/GlueX items
    1. Beam intensity fluctuations ...
    2. other systems?
  3. Run Plan
    1. Tagger Alignment ~2hr (Alex B.)
    2. 50um diamond alignment ~1hr (Hovanes)
    3. Mode 8 run w/ Amorphous ~1hr
    4. PS magnet current studies ~2hr (Alex S.)
    5. TRD run ~1hr (Lubomir, Sergey)
    6. Production running
  4. Offline analysis?
  5. Accumulated Data -> Physics(PDF)
    1. Day shift Tuesday?
  6. AOB?

Friday, April 8

  1. Accelerator Status
    1. Beam to Hall-D ~14:45 Thursday
    2. Good beam quality (5C11,5C11B harp scans)(Hall-D harp scan)
    3. Virtual electron beam spot on collimator
    4. Power outage took out ESR which took out cryo to Hall-A target etc. (will be recovering most of today)
    5. Hall-B becomes priority starting at 3pm, but accelerator will be tuning to dumplette beforehand in preparation
  2. Hall-D/GlueX items
    1. Beam intensity fluctuations ...
    2. other systems?
  3. Run Plan
    1. Re-establish good photon beam
    2. PS collimator scan ~1hr (Hovanes)
    3. Microscope alignment ~1hr (Alex B.)
    4. Trigger Studies ~4hr (Alex S.)
    5. PS magnet current studies ~2hr (Alex S.)
    6. TRD run ~1hr (Lubomir, Sergey)
    7. Production running
  4. Offline analysis?
  5. Accumulated Data -> Physics(PDF)
  6. AOB?

Thursday, April 7

  1. Accelerator Status
    1. No beam overnight (CW briefly sent to tagger dump for matching)
    2. Best estimate for beam is now noonish
  2. Hall-D/GlueX items
    1. Target cooled to "Empty and Ready" last night
    2. Solenoid ramped to 1000A
    3. Radiator, Goniometer, Profiler all in retracted positions. Collimator in blocking position
    4. other systems?
  3. Run Plan
    1. Re-establish good photon beam
    2. PS harp scan ~1hr (Hovanes)
    3. Microscope alignment ~1hr (Alex B.)
    4. Trigger Studies ~4hr (Alex S.)
    5. PS magnet current studies ~2hr (Alex S.)
    6. TRD run ~1hr (Lubomir, Sergey)
    7. Production running
  4. Offline analysis?
  5. Accumulated Data -> Physics(PDF)
  6. AOB?

Wednesday, April 6

  1. Accelerator Status
    1. No beam for day shift, possible at end of swing shift
    2. All shifts cancelled for today until 8pm. Standby until midnight. (Plan on (wo)manning shifts starting with owl 4/7)
    3. Hall-A will go to 4-pass beam today and use the 4th pass RF separator. They will try 5th pass separation again next week
  2. Hall-D/GlueX items
    1. Any need for controlled access?
    2. Target is warmed to 244K
    3. Beam intensity fluctuations ...
    4. Integrated luminosity -> thresholds for publishable results??
    5. other systems?
  3. Run Plan
    1. Re-establish good photon beam
    2. FCAL test with 5mm collimator ~1hr (Adesh)
    3. PS magnet current studies ~2hr (Alex S.)
    4. TRD run ~1hr (Lubomir, Sergey)
    5. DAQ Studies ~1hr (Sergey, David)
    6. Microscope alignment ~1hr (Alex B.)
    7. Trigger Studies ~4hr (Alex S.)
    8. Production running
  4. Offline analysis?
  5. AOB?

Tuesday, April 5

  1. Accelerator Status
    1. No beam since 9am Monday due to re-tune
    2. Hot spot found in accelerator downstream of 5th pass separator (25R on contact, largest ever at CEBAF)
    3. Physics quality beam unlikely before Friday
    4. All shifts cancelled for today. Tomorrow (Wed.) on standby starting 8am
    5. Persons with shifts this week should send phone number to RC since more shifts will likely be moved to standby
    6. Hall-A will go to 2-pass beam then 4-pass beam (Hall-D is only capable of taking 5-pass beam)
  2. Hall-D/GlueX items
    1. Short access yesterday for walktrhough and FCAL maintainence
    2. Target warmed to >80K for at least 90 minutes to melt any potential Nitrogen ice. (It was emptied this morning due to cancelled shifts)
    3. Beam intensity fluctuations ...
    4. Integrated luminosity -> thresholds for publishable results??
    5. other systems?
  3. Run Plan
    1. Re-establish good photon beam
    2. FCAL test with 5mm collimator ~1hr (Adesh)
    3. PS magnet current studies ~2hr (Alex S.)
    4. TRD run ~1hr (Lubomir, Sergey)
    5. DAQ Studies ~1hr (Sergey, David)
    6. Microscope alignment ~1hr (Alex B.)
    7. Trigger Studies ~4hr (Alex S.)
    8. Production running
  4. Offline analysis?
  5. AOB?

Monday, April 4

  1. Accelerator Status
    1. No beam or poorly positioned beam until ~3:30am Sunday April 3
    2. Bleedthrough from Hall-A
    3. Accelerator experts convening this morning to form plan for fixing issues with beam. May be disruptive today or tomorrow morning as they implement plan
    4. Hall A gets priority Today
  2. Hall-D/GlueX items
    1. Completed empty target run with amorphous radiator
    2. Difficulty getting consistent PARA and PERP at same location on JD70-118. Switch to JD70-119.
    3. CDC HV trips frequently. Current trip levels had inadvertently been reduced to 2uA (fixed)
    4. beam intensity fluctuations
      • Hovanes suggests regular harp scans, including two ACC harps in D beamline, MCC must do those
      • Request accelerator formalize scan procedure for 5C11 and 5C11B. Todd will write something up
    5. other systems?
  3. Run Plan
    1. empty target run
    2. Satellite peak study (move beam)
    3. PS magnet current studies
    4. TRD run
    5. DAQ Studies
    6. Microscope alignment (Alex B.)
    7. Production running
  4. Offline analysis?
  5. AOB?

Sunday, April 3

  1. Accelerator Status
    1. Beam was gone until ~2am Saturday April 2
    2. Frequent RF trips, poor profile scans, poor enhancement
    3. Spotty or unacceptably poor beam from 13:00 Saturday to 3:30 Sunday (Issues with bleedthrough from other halls (?))
    4. Improved beam profile
    5. Hall A gets priority Monday
  2. Hall-D/GlueX items
    1. Completed empty target run with both PARA and PERP orientations
    2. Difficulty getting consistent PARA and PERP at same location on JD70-118. Switch to JD70-119.
    3. CDC HV trips frequently
    4. beam intensity fluctuations
    5. tagger harp scan shows sigma_x = 0.9 mm, sigma_y = 1.1 mm, possibly better focusing on collimator
      • Hovanes suggests regular harp scans, including two ACC harps in D beamline, MCC must do those
    6. Shift-takers run comments: Discussion deferred
    7. other systems?
  3. Run Plan
    1. empty target run
    2. PS magnet current studies
    3. TRD run
    4. Satellite peak study (move beam)
    5. Microscope alignment (Alex B.)
    6. production running
  4. Offline analysis?
  5. AOB?