Difference between revisions of "Run Planning Meeting Notes, August 11- August 17, 2022"

From GlueXWiki
Jump to: navigation, search
(Friday August 12)
Line 1: Line 1:
 +
Back to [[Run Coordination Meetings:Summer2022]]
 +
 +
Meeting are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)
 +
 +
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]
 +
 +
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
 +
 +
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 +
 
= Thursday August 11 =
 
= Thursday August 11 =
 
=== Past 24 hours ===
 
=== Past 24 hours ===

Revision as of 09:33, 11 August 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday August 11

Past 24 hours

  • Running on Pb target (30 nA). Another relatively good day: ABU=18.3 h for the day
  • Beam down for 3.75 hrs due to afternoon thunderstorms
  • Program Deputy summary

Shift Reports

Reports

Issues

Plans

  • Beam off all day for maintenance day
  • Hall in controlled access
    • Solenoid current to be lowered because of cryowork. Tim seems to be doing this from home as we speak.
  • Requested survey of tagger hall for access to reset TAGH crate
  • When beam restored run harp scans
  • Production on Pb target.
  • Next pass change (4->3) for Hall C will be Tuesday. They will be down for 6h-8h Monday to install their aerogel. Monday is auspicious for a TAC run.

Friday August 12

Past 24 hours

  • Beam off Thu 630 am - ?? pm for maintenance day
  • ~ 9 am access to tagger hall by Beni to reset TAGH HV crate; OK now
  • ramped down solenoid for cry work (Tim)

Shift Reports

Reports

Issues

Plans

Monday August 14

Past 24 hours