(Monday August 14)
(Past 24 hours)
Line 41: Line 41:
 
* ~ 9 am access to tagger hall by Beni to reset TAGH HV crate; OK now
 
* ~ 9 am access to tagger hall by Beni to reset TAGH HV crate; OK now
 
* ramped down solenoid for cry work (Tim)
 
* ramped down solenoid for cry work (Tim)
 +
 +
* resume prodcution data Friday 3:18 am
  
 
=== Shift Reports ===
 
=== Shift Reports ===

Revision as of 17:02, 12 August 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday August 11

Past 24 hours

  • Running on Pb target (30 nA). Another relatively good day: ABU=18.3 h for the day
  • Beam down for 3.75 hrs due to afternoon thunderstorms
  • Program Deputy summary

Shift Reports

Reports

Issues

Plans

  • Beam off all day for maintenance day
  • Hall in controlled access
    • Solenoid current to be lowered because of cryowork. Tim seems to be doing this from home as we speak.
  • Requested survey of tagger hall for access to reset TAGH crate
  • When beam restored run harp scans
  • Production on Pb target.
  • Next pass change (4->3) for Hall C will be Tuesday. They will be down for 6h-8h Monday to install their aerogel. Monday is auspicious for a TAC run.

Friday August 12

Past 24 hours

  • Beam off Thu 630 am - ?? pm for maintenance day
  • ~ 9 am access to tagger hall by Beni to reset TAGH HV crate; OK now
  • ramped down solenoid for cry work (Tim)
  • resume prodcution data Friday 3:18 am

Shift Reports

Reports

  • Beni reset the TAGH HV crate; it's communicating again ([1])
  • Malte changed 2 FCAL bases ([2], [3])
  • The filter material (Molecular Sieve) Assy. for the Cryomech cold compressor in Hall-D has been completed by target group
  • Tim also reports that compressor swap is complete; not sure whether that refers to the target group's work?
  • Beam delivary after maintenance day delayed until ??? due to a leak in magnet LCW hose in NL.

Issues

Plans

  • Continue with prodcution data on Pb through the weekend.
  • Plan for TAC run on Monday, when Hall C installs their aerogel.

Monday August 14

Friday

Saturday

Sunday

Past 24 hours