Difference between revisions of "Run Planning Meeting Notes, August 11- August 17, 2022"
From GlueXWiki
(→Past 24 hours) |
(→Friday) |
||
Line 64: | Line 64: | ||
= Monday August 14 = | = Monday August 14 = | ||
== Friday == | == Friday == | ||
+ | === Day through Owl === | ||
+ | * at 7:45 am meeting Hall B complained about bleedthrouhg from C; | ||
+ | * at 12 pm MCC starts tuning | ||
+ | * Beam down for looong time | ||
+ | <!-- * [https://logbooks.jlab.org/entry/4027490 Program Deputy summary] --> | ||
+ | * Running on Pb target (30 nA) | ||
+ | |||
+ | {| class=wikitable | ||
+ | |+ Recorded BTA | ||
+ | |- | ||
+ | ! Shift | ||
+ | ! ABU | ||
+ | ! BANU | ||
+ | ! BNA | ||
+ | ! ER | ||
+ | |- | ||
+ | ! 8/12 Day | ||
+ | | 4.24 h || 3.3 min || 3.70 h || 8 h | ||
+ | |- | ||
+ | !8/12 Swing | ||
+ | | 2.97 h || 1.40 h || 3.63 h || 8 h | ||
+ | |- | ||
+ | !8/13 Owl | ||
+ | | 6.49 h || 0.30 h || 1.20 h || 7.93 h | ||
+ | |- | ||
+ | |- | ||
+ | ! Total | ||
+ | | 13.70 h || 1.76 h || 8.53 h || 23.93 h | ||
+ | |} | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4027930 Day shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4028084 Swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4028182 Owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4028265 Eraly riser shift summary] | ||
+ | |||
+ | === Reports === | ||
+ | * | ||
+ | |||
+ | === Issues === | ||
+ | * | ||
+ | |||
+ | === Plans === | ||
+ | * | ||
+ | |||
== Saturday == | == Saturday == | ||
== Sunday == | == Sunday == | ||
=== Past 24 hours === | === Past 24 hours === |
Revision as of 17:14, 13 August 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday August 11
Past 24 hours
- Running on Pb target (30 nA). Another relatively good day: ABU=18.3 h for the day
- Beam down for 3.75 hrs due to afternoon thunderstorms
- Program Deputy summary
Shift Reports
- Day shift summaries (1), (2)
- Swing shift summary (1), (2)
- Owl shift summary
- Early Riser shift summary
Reports
Issues
- Continued: TAGH major link alarm. Description by shift leader. Cannot communicate with crate, but rates are fine -> we decided to run as it is (monitoring TAGH scalars with stripcharts) and have a look latter.
Plans
- Beam off all day for maintenance day
- Hall in controlled access
- Solenoid current to be lowered because of cryowork. Tim seems to be doing this from home as we speak.
- Requested survey of tagger hall for access to reset TAGH crate
- When beam restored run harp scans
- Production on Pb target.
- Next pass change (4->3) for Hall C will be Tuesday. They will be down for 6h-8h Monday to install their aerogel. Monday is auspicious for a TAC run.
Friday August 12
Past 24 hours
- Beam off Thu 630 am - ?? pm for maintenance day
- ~ 9 am access to tagger hall by Beni to reset TAGH HV crate; OK now
- ramped down solenoid for cry work (Tim)
- resume prodcution data Friday 3:18 am
Shift Reports
Reports
- Beni reset the TAGH HV crate; it's communicating again ([1])
- Malte changed 2 FCAL bases ([2], [3])
- The filter material (Molecular Sieve) Assy. for the Cryomech cold compressor in Hall-D has been completed by target group
- Tim also reports that compressor swap is complete; not sure whether that refers to the target group's work?
- Beam delivary after maintenance day delayed until ??? due to a leak in magnet LCW hose in NL.
Issues
Plans
- Continue with prodcution data on Pb through the weekend.
- Plan for TAC run on Monday, when Hall C installs their aerogel.
Monday August 14
Friday
Day through Owl
- at 7:45 am meeting Hall B complained about bleedthrouhg from C;
- at 12 pm MCC starts tuning
- Beam down for looong time
- Running on Pb target (30 nA)
Shift | ABU | BANU | BNA | ER |
---|---|---|---|---|
8/12 Day | 4.24 h | 3.3 min | 3.70 h | 8 h |
8/12 Swing | 2.97 h | 1.40 h | 3.63 h | 8 h |
8/13 Owl | 6.49 h | 0.30 h | 1.20 h | 7.93 h |
Total | 13.70 h | 1.76 h | 8.53 h | 23.93 h |