(Thursday, August 13)
Line 22: Line 22:
 
#** CPP's preference: schedule the CPP test after Aug 21.
 
#** CPP's preference: schedule the CPP test after Aug 21.
 
#** Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
 
#** Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
 +
 +
# Report/test
 +
# [https://logbooks.jlab.org/entry/3825906 DIRC/COMCAL HV CAEN reboot test]
 
# Pending issues:
 
# Pending issues:
 
#* TagM card issue.
 
#* TagM card issue.

Revision as of 08:23, 13 August 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet

Thursday, August 13

  1. Last 24 hours
    • Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.
    • Stable beam established after 7:30 pm yesterday.
    • Diamond alignment completed by Hovanes during his shift
    • TAGH scan completed by Sasha during his shift [1]
  2. Reports/Issues
    • Monitoring link (Twice a day monitoring line) is slow last night. [2]
    • DIRC LV tripped due to the cur off during night
  3. Run Plan
    • Next harp scan?
    • Production
    • Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock (Hall A is off in the same time), 350nA beam will trip AD00.
    • CPP installation:
      • CPP's preference: schedule the CPP test after Aug 21.
      • Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
  1. Report/test
  2. DIRC/COMCAL HV CAEN reboot test
  3. Pending issues:
    • TagM card issue.