(Thursday, August 13)
(Thursday, August 13)
Line 7: Line 7:
 
==  Thursday, August 13 ==
 
==  Thursday, August 13 ==
  
 +
# Announcement
 +
#* Current run period has be extended to September 21.
 +
#* [https://docs.google.com/spreadsheets/d/1znQG_AE8s9My28WZDchO-a_LHDBZosNyig6_jOzB0GQ/edit#gid=0 Updated shift list]
 
# Last 24 hours
 
# Last 24 hours
 
#* Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.  
 
#* Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.  

Revision as of 08:31, 13 August 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet

Thursday, August 13

  1. Announcement
  2. Last 24 hours
    • Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.
    • Stable beam established after 7:30 pm yesterday.
    • Diamond (JD-105 45/135) alignment completed by Hovanes during his shift
    • TAGH scan completed by Sasha during his shift [1]
  3. Reports/Issues
    • Monitoring link (Twice a day monitoring line) is slow last night. [2]
    • DIRC LV tripped due to the current off during swing [3]
  4. Run Plan
    • Next harp scan?
    • Production
    • Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock (Hall A is off in the same time), 350nA beam will trip AD00.
    • CPP installation:
      • CPP's preference: schedule the CPP test after Aug 21.
      • Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
  5. Report/test
  6. Pending issues:
    • TagM card issue, any update?