(Thursday, August 13)
Line 4: Line 4:
  
 
[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=578563767 GlueX Statistics Run Sheet]
 
[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=578563767 GlueX Statistics Run Sheet]
 +
 +
 +
==  Friday, August 14 ==
 +
# Last 24 hours
 +
#* Stable-ish beam through yesterday to this morning, ~1.3 B triggers collected
 +
#* Beamline Turbo pump controller failed, Keith
 +
# Reports/Issues
 +
#* Need to pay special attention to the coherent peak position
 +
#** Amount of adjust (to the coherent peak) is increased (45/135) each time we change orientation
 +
#** Amo to 0/90 para requires (Beni)
 +
#** Beam drift due to lost beam lock.
 +
# Pending issues:
 +
#* TagM card issue:
 +
#* FCAL remote controller PDU reset. (No reset planned for other three PDUs)
 +
# Run Plan
 +
#* No long beam trips, no harp yesterday. Next harp scan?
 +
#* Production
 +
#* Hall C path change tentatively at August 24th (for three days). Question regarding beam stability and maximum current is raised to Jay, being discussed amount experts. Possible solution: tune beam two a shift to stabilize the lock; Use AD00 BCM as BPM, etc. Jay will get back to me.
 +
#* CPP installation:
 +
#** CPP's preference: schedule the CPP test after Aug 21.
 +
#** Maintenance schedule to be decided.
  
 
==  Thursday, August 13 ==
 
==  Thursday, August 13 ==

Revision as of 08:20, 14 August 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet


Friday, August 14

  1. Last 24 hours
    • Stable-ish beam through yesterday to this morning, ~1.3 B triggers collected
    • Beamline Turbo pump controller failed, Keith
  2. Reports/Issues
    • Need to pay special attention to the coherent peak position
      • Amount of adjust (to the coherent peak) is increased (45/135) each time we change orientation
      • Amo to 0/90 para requires (Beni)
      • Beam drift due to lost beam lock.
  3. Pending issues:
    • TagM card issue:
    • FCAL remote controller PDU reset. (No reset planned for other three PDUs)
  4. Run Plan
    • No long beam trips, no harp yesterday. Next harp scan?
    • Production
    • Hall C path change tentatively at August 24th (for three days). Question regarding beam stability and maximum current is raised to Jay, being discussed amount experts. Possible solution: tune beam two a shift to stabilize the lock; Use AD00 BCM as BPM, etc. Jay will get back to me.
    • CPP installation:
      • CPP's preference: schedule the CPP test after Aug 21.
      • Maintenance schedule to be decided.

Thursday, August 13

  1. Announcement
  2. Last 24 hours
    • Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.
    • Stable beam established after 7:30 pm yesterday.
    • Diamond (JD-105 45/135) alignment completed by Hovanes during his shift
    • TAGH scan completed by Sasha during his shift [1]
  3. Reports/Issues
    • Monitoring link (Twice a day monitoring line) is slow last night. [2]
    • DIRC LV tripped due to the current off during swing [3]
  4. Run Plan
    • Next harp scan?
    • Production
    • Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock (Hall A is off in the same time), 350nA beam will trip AD00.
    • CPP installation:
      • CPP's preference: schedule the CPP test after Aug 21.
      • Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
  5. Report/test
  6. Pending issues:
    • TagM card issue, any update?