Difference between revisions of "Run Planning Meeting Notes, August 13 -17, 2020"

From GlueXWiki
Jump to: navigation, search
(Created page with "<- Back to Run Coordination Meetings:Summer2020 [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Integrated trigger count] [https:/...")
 
(Wednesday, August 12)
Line 5: Line 5:
 
[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=578563767 GlueX Statistics Run Sheet]
 
[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=578563767 GlueX Statistics Run Sheet]
  
==  Wednesday, August 12 ==
+
==  Thursday, August 13 ==
  
 
# Last 24 hours
 
# Last 24 hours
 +
 +
#*
 +
 +
 
#* TagM card replacements (Richard, Nick, Chris) [https://logbooks.jlab.org/entry/3825006]
 
#* TagM card replacements (Richard, Nick, Chris) [https://logbooks.jlab.org/entry/3825006]
 
#* Test crystals installed [https://logbooks.jlab.org/entry/3825078]
 
#* Test crystals installed [https://logbooks.jlab.org/entry/3825078]
Line 15: Line 19:
 
#* 6:00am: Production
 
#* 6:00am: Production
 
# Reports/Issues
 
# Reports/Issues
#* DIRC HV off during night
+
 
 +
#* DIRC LV tripped due to the cur off during night
 +
 
 
# Run Plan
 
# Run Plan
 
#* Moving beam spot on diamond during Hovanes' shift
 
#* Moving beam spot on diamond during Hovanes' shift

Revision as of 07:43, 13 August 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet

Thursday, August 13

  1. Last 24 hours


    • TagM card replacements (Richard, Nick, Chris) [1]
    • Test crystals installed [2]
    • Beam tuning throughout the night
    • 8pm: Harp scan attempt, motor stuck [3], [4], done at 10:30pm
    • 2:45am: Harp scan [5]
    • 6:00am: Production
  1. Reports/Issues
    • DIRC LV tripped due to the cur off during night
  1. Run Plan
    • Moving beam spot on diamond during Hovanes' shift
    • Production
    • Tuesday: Pass change for Hall C ?
  2. AOB
    • Thanks to all on-site and monitoring shift crews, experts on call and everybody working in the hall
    • Next RC: Bill Li