Run Planning Meeting Notes, August 13 -17, 2020

From GlueXWiki
Revision as of 07:39, 13 August 2020 by Billlee (Talk | contribs) (Created page with "<- Back to Run Coordination Meetings:Summer2020 [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Integrated trigger count] [https:/...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet

Wednesday, August 12

  1. Last 24 hours
    • TagM card replacements (Richard, Nick, Chris) [1]
    • Test crystals installed [2]
    • Beam tuning throughout the night
    • 8pm: Harp scan attempt, motor stuck [3], [4], done at 10:30pm
    • 2:45am: Harp scan [5]
    • 6:00am: Production
  2. Reports/Issues
    • DIRC HV off during night
  3. Run Plan
    • Moving beam spot on diamond during Hovanes' shift
    • Production
    • Tuesday: Pass change for Hall C ?
  4. AOB
    • Thanks to all on-site and monitoring shift crews, experts on call and everybody working in the hall
    • Next RC: Bill Li