Thursday, August 13

  1. Last 24 hours
    • Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.
    • Stable beam established after 7:30 pm yesterday.
    • Diamond (JD105 45/135) alignment completed by Hovanes during his shift
    • TAGH scan completed by Sasha during his shift [1]
  2. Reports/Issues
    • Monitoring link (Twice a day monitoring line) is slow last night. [2]
    • DIRC LV tripped due to the current off during swing [3]
  3. Run Plan
    • Next harp scan?
    • Production
    • Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock (Hall A is off in the same time), 350nA beam will trip AD00.
    • CPP installation:
      • CPP's preference: schedule the CPP test after Aug 21.
      • Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
  4. Report/test
  5. Pending issues:
    • TagM card issue, any update?