Difference between revisions of "Run Planning Meeting Notes, August 18, 2022"

From GlueXWiki
Jump to: navigation, search
(Shift Reports)
(Past 24 hours)
 
(4 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
= Thursday August 18 =
 
= Thursday August 18 =
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 +
* Waititng for beam until 16:50
 +
* Did harp scans (crew first ran collimator scan)
 +
* Another 9 hours ABU
 +
* There are run(s) with coherent edge issues,e.g. [https://logbooks.jlab.org/entry/4030574 101618]
  
 
=== Shift Reports ===
 
=== Shift Reports ===
Line 41: Line 45:
  
 
=== Reports ===
 
=== Reports ===
 +
Harp scans [https://logbooks.jlab.org/entry/4030365 IHA5C11], [https://logbooks.jlab.org/entry/4030373 5C11B], [https://logbooks.jlab.org/entry/4030413 radiator], [https://logbooks.jlab.org/entry/4030429 convergence].
  
 
=== Issues ===
 
=== Issues ===
 +
* Vertical beam excursions are still an issue; here some sample plot: [https://logbooks.jlab.org/entry/4030750], [https://logbooks.jlab.org/entry/4030674]
  
 
=== Plans ===
 
=== Plans ===
 
* The run is finished; analyze the data!
 
* The run is finished; analyze the data!

Latest revision as of 08:39, 18 August 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Thursday August 18

Past 24 hours

  • Waititng for beam until 16:50
  • Did harp scans (crew first ran collimator scan)
  • Another 9 hours ABU
  • There are run(s) with coherent edge issues,e.g. 101618

Shift Reports

Recorded BTA
Shift ABU BANU BNA & ACC ER
8/17 Day [1] 0 h 0 h 8 h 8 h
8/17 Swing [2] 3.43 h 0.21 h 4.38 h 7.93 h
8/17 Owl [3] 5.66 h 1.44 h 0.90 h 6.57 h
Total 9.09 h 1.65 h 13.28 h 22.5 h

Reports

Harp scans IHA5C11, 5C11B, radiator, convergence.

Issues

  • Vertical beam excursions are still an issue; here some sample plot: [4], [5]

Plans

  • The run is finished; analyze the data!