Difference between revisions of "Run Planning Meeting Notes, August 18 - August 23, 2022"

From GlueXWiki
Jump to: navigation, search
(Thursday August 18)
(Readiness Check List)
Line 7: Line 7:
  
 
=== Readiness Check List===
 
=== Readiness Check List===
 +
*Solenoid (Eugene/Beni)
 +
**Start the run with magnetic field on
  
 
+
*Surveys (Tim/Mark)
 
+
** FCAL survey
 +
** TOF syrvey
 +
** ST syrvey
 +
** TAGM
 +
** TAGH
 +
** Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
 +
** Survey CCAL after it's installed in the Hall
 +
*DAQ  (Sergei). 
 +
** Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
 +
*Trigger (Alex S.)
 +
** Check physics triggers
 +
** Run CCAL trigger when the detector is installed in the Hall
 +
** Connect / check CCAL LED and alpha triggers
 +
*Beam line
 +
** Install He beam pipe between FCAL and CCAL (Tim)
 +
** Install led shielding wall in front downstream the PS (Tim)
 +
** Radiator status
 +
*** Check amorphous radiator 
 +
** Tagger hodoscope (A. Somov)
 +
*** Install plates with TAGH counters
 +
*** Install / check repaired TAGH countes
 +
**Tagger microscope (Tim / Richard Jones)
 +
*** Move TAGM to the new location and rotate
 +
**Collimator Motion (Hovanes)
 +
*** Not changed
 +
**Active collimator detectors(Richard Jones/Alexandre Deur)
 +
*** Move active collimator to 5 mm hole
 +
*** Check
 +
**Profiler  (Hovanes)
 +
*** Not changed
 +
**Luminosity monitor (Hovanes)
 +
*** Not changed
 +
**Halo monitors
 +
*** Not changed
 +
**PS system (Alex Somov)
 +
*** Not changed
 +
**Beam line magnets (PS magnet sweeping magnet and tagger quads).
 +
*** Change filed of the PS magnet
 +
**Polarimeter (Sebastian Cole/M. Dugger)
 +
*** Optional, not used in PrimEx
 +
** Targets (Chris/Tim/Alexandre D.)
 +
*** LH4
 +
*** Be
 +
**TAC (Alex Somov/Hovanes)
 +
*** Use CCAL (TAC can be used as a backup)
 +
**Slow control (Hovanes)
 +
*** Check CCAL
 +
**RF (Sergei)
 +
*** Not changed
 +
**Radiation monitors (Alexandre D.)
 +
*** Not changed
 +
*Detector systems
 +
**ST (Beni)
 +
*** Connect cables, check dark rate
 +
** FDC (Lubomir) 
 +
*** Not changed
 +
** CDC (Beni)
 +
*** Move CDC1 crate to the nominal position, cable up
 +
*** Check readout
 +
** BCal (Mark D. / Elton)
 +
*** Not changed
 +
** FCal (Mark D.)
 +
*** Check / replace bases if needed
 +
** ComCal (Alex Somov)
 +
** Check detector controls (Nick)
 +
*** Install CCAL platform
 +
*** Check platform motion
 +
*** Installed detector on the platform
 +
*** Connect cables
 +
*** Connect LMS
 +
*** Check detector
 +
**TOF (Beni) 
 +
*** Remove inner acrylic absorber
  
 
=== Reports ===
 
=== Reports ===

Revision as of 15:38, 17 August 2022

Thursday August 18

Past 24 hours

Reconfiguration Plan

Readiness Check List

  • Solenoid (Eugene/Beni)
    • Start the run with magnetic field on
  • Surveys (Tim/Mark)
    • FCAL survey
    • TOF syrvey
    • ST syrvey
    • TAGM
    • TAGH
    • Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
    • Survey CCAL after it's installed in the Hall
  • DAQ (Sergei).
    • Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
  • Trigger (Alex S.)
    • Check physics triggers
    • Run CCAL trigger when the detector is installed in the Hall
    • Connect / check CCAL LED and alpha triggers
  • Beam line
    • Install He beam pipe between FCAL and CCAL (Tim)
    • Install led shielding wall in front downstream the PS (Tim)
    • Radiator status
      • Check amorphous radiator
    • Tagger hodoscope (A. Somov)
      • Install plates with TAGH counters
      • Install / check repaired TAGH countes
    • Tagger microscope (Tim / Richard Jones)
      • Move TAGM to the new location and rotate
    • Collimator Motion (Hovanes)
      • Not changed
    • Active collimator detectors(Richard Jones/Alexandre Deur)
      • Move active collimator to 5 mm hole
      • Check
    • Profiler (Hovanes)
      • Not changed
    • Luminosity monitor (Hovanes)
      • Not changed
    • Halo monitors
      • Not changed
    • PS system (Alex Somov)
      • Not changed
    • Beam line magnets (PS magnet sweeping magnet and tagger quads).
      • Change filed of the PS magnet
    • Polarimeter (Sebastian Cole/M. Dugger)
      • Optional, not used in PrimEx
    • Targets (Chris/Tim/Alexandre D.)
      • LH4
      • Be
    • TAC (Alex Somov/Hovanes)
      • Use CCAL (TAC can be used as a backup)
    • Slow control (Hovanes)
      • Check CCAL
    • RF (Sergei)
      • Not changed
    • Radiation monitors (Alexandre D.)
      • Not changed
  • Detector systems
    • ST (Beni)
      • Connect cables, check dark rate
    • FDC (Lubomir)
      • Not changed
    • CDC (Beni)
      • Move CDC1 crate to the nominal position, cable up
      • Check readout
    • BCal (Mark D. / Elton)
      • Not changed
    • FCal (Mark D.)
      • Check / replace bases if needed
    • ComCal (Alex Somov)
    • Check detector controls (Nick)
      • Install CCAL platform
      • Check platform motion
      • Installed detector on the platform
      • Connect cables
      • Connect LMS
      • Check detector
    • TOF (Beni)
      • Remove inner acrylic absorber