Difference between revisions of "Run Planning Meeting Notes, August 20-26, 2020"

From GlueXWiki
Jump to: navigation, search
(Created page with "<- Back to Run Coordination Meetings:Summer2020 [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Integrated trigger count] [https:/...")
 
Line 6: Line 6:
  
 
==  Thursday, August 20 ==
 
==  Thursday, August 20 ==
 +
# Last 24 hours
 +
#* Good production
 +
#* Started Low current cycle
 +
# Report/issues:
 +
#* Data rate fluctuations: https://logbooks.jlab.org/entry/3831398
 +
#* Energy value dropped to 0 called MCC to fix.  Something to watch for.  https://logbooks.jlab.org/entry/3831173
 +
#* Problems with rootspy and hydra.
 +
# Pending issues:
 +
#* TAGH Disc counter not functioning properly (Sasha)
 +
#* TAGM control boards (Nick, Richard).
 +
# Run Plan
 +
#* Continue low current running
 +
#* TAC run on Friday which  Hall C is down for target change

Revision as of 08:45, 20 August 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet

Thursday, August 20

  1. Last 24 hours
    • Good production
    • Started Low current cycle
  2. Report/issues:
  3. Pending issues:
    • TAGH Disc counter not functioning properly (Sasha)
    • TAGM control boards (Nick, Richard).
  4. Run Plan
    • Continue low current running
    • TAC run on Friday which Hall C is down for target change