Line 26: Line 26:
 
#* Harps scans: [https://logbooks.jlab.org/entry/3834110][https://logbooks.jlab.org/entry/3834106][https://logbooks.jlab.org/entry/3834129]  [https://logbooks.jlab.org/entry/3834167 convergence good]  
 
#* Harps scans: [https://logbooks.jlab.org/entry/3834110][https://logbooks.jlab.org/entry/3834106][https://logbooks.jlab.org/entry/3834129]  [https://logbooks.jlab.org/entry/3834167 convergence good]  
 
# Pending issues:
 
# Pending issues:
#* TAGM missing channels due to preamp (Nick, Richard).
+
#* TAGM missing channels due to preamp (Nick, Richard). [https://logbooks.jlab.org/entry/3834294 Update]
 
# Run Plan
 
# Run Plan
 
#* Production
 
#* Production

Revision as of 17:15, 25 August 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet


MEDCON 5 restrictions (Bob May email)

  1. adhere to counting room capacity restrictions
  2. maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
  3. wear masks anytime more than one person present in the counting room
  4. at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
  5. food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.


Wednesday, August 26

  1. Last 24 hours:
    • Access during cavity work
    1. FCAL base replacement
    2. Work on TRD
    3. Crystals installed
  2. Report/issues:
  3. Pending issues:
    • TAGM missing channels due to preamp (Nick, Richard). Update
  4. Run Plan
    • Production


Discussion on CPP and GEM-TRD tests

CPP_Test_2020_-_Schedule


Tuesday, August 25

  1. Last 24 hours:
    • Smooth production
  2. Report/issues:
  3. Pending issues:
    • TAGM missing channels due to preamp (Nick, Richard).
  4. Run Plan
    • Production


Monday, August 24

  1. Last 3 days:
  2. Report/issues:
  3. Pending issues:
    • TAGM missing channels due to preamp (Nick, Richard).
  4. Run Plan
    • Production
    • No near-term machine studies or RF recovery is planned.
    • Hall C change to 1 pass tentatively scheduled for 31 August.


Friday, August 21

  1. Announcements
    • MEDCON 5 restrinctions
  2. Last 24 hours:
  3. Report/issues:
  4. Pending issues:
    • TAGM preamp (Nick, Richard).
  5. Run Plan
    • TAC run on Friday while Hall C is down for target change


Thursday, August 20

  1. Last 24 hours
    • Good production (Total 242.7 B triggers)
    • Started Low current cycle
  2. Report/issues:
  3. Pending issues:
    • TAGH Disc counter not functioning properly (Sasha)
    • TAGM preamp (Nick, Richard).
  4. Run Plan
    • Continue low current running
    • TAC run on Friday while Hall C is down for target change