[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
  
 +
= Wednesday August 10 =
 +
=== Past 24 hours ===
 +
* Pass change for Hall C (8:30am-13:30)
 +
**Malte [https://logbooks.jlab.org/entry/4026393 changed 3 PMT basis in FCal].
 +
* Harp scans when the beam came back.
 +
* Running on Pb target (30 nA). Another relatively good day: ABU=13.9h for the day (minus 4h of pass change -> 70% efficiency). Overall, quite a good week: ABU=103h for the week (64% efficiency).
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4026393 Day shift summaries (1)], [https://logbooks.jlab.org/entry/4026649 (2)]
 +
* [https://logbooks.jlab.org/entry/4026671 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4026819 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4026903 Early Riser shift summary]
 +
=== Reports ===
 +
*Harp scans: [https://logbooks.jlab.org/entry/4026585 5C11], [https://logbooks.jlab.org/entry/4026587 5C11b] and [https://logbooks.jlab.org/entry/4026603 radiator harp]. [https://logbooks.jlab.org/entry/4026614 The beam convergence looks good].
 +
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4026820 TAGH major link alarm]. [https://logbooks.jlab.org/entry/4026819 Description by shift leader]. Cannot communicate with crate, but rates are fine -> we decided to run as it is (monitoring TAGH scalars with stripcharts) and have a look latter.
 +
*Last night, had to wait again with beam down for 15min for a trip to be allowed to insert amorphous radiator. RC wrote again to Hall D ops contact and PD to ask for this policy to be amended. RC will complain at the weekly 1:30pm MCC meeting.
 +
 +
=== Plans ===
 +
* Production on Pb target. We will not switch to empty target tomorrow as initially considered.
 +
* [http://accboard.acc.jlab.org/ Tomorrow (Thursday 11th): maintenance day starting at 6:30am.]
 +
**Solenoid current to be lowered because of cryowork.
 +
* Next pass change (4->3) for Hall C will be Tuesday. They will be down for 6h-8h Monday to install their aerogel. Monday is auspicious for a TAC run.
 +
 +
= Tuesday August 9 =
 +
=== Past 24 hours ===
 +
* Running on Pb target (30 nA). Very good running: ABU=17.1h (71% efficiency)
 +
 +
=== Shift Reports ===
 +
* [https://logbooks.jlab.org/entry/4025776 Day shift summary ]
 +
* [https://logbooks.jlab.org/entry/4025923 Swing shift summary]
 +
* [https://logbooks.jlab.org/entry/4026117 Owl shift summary]
 +
* [https://logbooks.jlab.org/entry/4026249 Early Riser shift summary]
 +
=== Reports ===
 +
* [https://logbooks.jlab.org/entry/4026300 Electron beam energy monitoring]
 +
* [https://logbooks.jlab.org/entry/4025742 Accuracy of the electron beam energy monitoring]
 +
 +
=== Issues ===
 +
* [https://logbooks.jlab.org/entry/4025637 DAQ RCDB warning occurs from time to time (see swing and owl shift summaries)]. [https://logbooks.jlab.org/entry/4025556 see e.g. here for some account]. It is a know issue and Sergei will fix it during the experiment transition. 
 +
 +
=== Plans ===
 +
* Today: 5 -> 4 pass change for Hall C. Starts at 8:30am.
 +
**Malte will change a couple of PMT basis in FCal.
 +
* Harp scans after the beam pass change, then back to Production on Pb target. When do we switch to empty target?
 +
* [http://accboard.acc.jlab.org/ Thursday 11th: maintenance day starting at 6:30am.]
 +
**Solenoid current to be lowered because of cryowork.
 +
* Next pass change (4->3) for Hall C will be Tuesday. They will likely be down for 6h-8h Monday to install their aerogel (unless they run with perfect efficiency, in which case they may
 +
do it Friday. This is very unlikely). So, Monday appears to be auspicious for a TAC run.
  
 
= Monday August 8 =
 
= Monday August 8 =
 
=== Past 72 hours ===
 
=== Past 72 hours ===
 
* Running on empty target until Friday morning, 7:15am.
 
* Running on empty target until Friday morning, 7:15am.
* No beam until Saturday 1am due to RF-recovery (Friday 7:15-11am) and then several accelerator problems (RF-recovery recovery, storm).
+
* No beam until Saturday 1am due to RF-recovery (Friday 7:15-11am) and then several accelerator problems (RF-recovery recovery, storm). Then, very good beam (in terms of ABU, trip rate and stability)
 
* From Saturday 1am, production on Pb target (30nA)
 
* From Saturday 1am, production on Pb target (30nA)
* ***h of ABU (***% efficiency).  
+
* 40.1h of ABU (59% efficiency).
 +
 
 
=== Shift Reports ===
 
=== Shift Reports ===
 
* [https://logbooks.jlab.org/entry/4024778 Friday Day shift summary ]
 
* [https://logbooks.jlab.org/entry/4024778 Friday Day shift summary ]
Line 25: Line 75:
 
* [https://logbooks.jlab.org/entry/4025181 Saturday Owl shift summary]
 
* [https://logbooks.jlab.org/entry/4025181 Saturday Owl shift summary]
 
* [https://logbooks.jlab.org/entry/4025270 Sunday Early Riser shift summary]
 
* [https://logbooks.jlab.org/entry/4025270 Sunday Early Riser shift summary]
* [ Sunday Day shift summary ]
+
* [https://logbooks.jlab.org/entry/4025369 Sunday Day shift summary ]
* [ Sunday Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4025452 Sunday Swing shift summary]
* [ Sunday Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4025556 Sunday Owl shift summary]
* [ Monday Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4025657 Monday Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===
 
* Harp scan (Saturday 1am): [https://logbooks.jlab.org/entry/4024904 5C11], [https://logbooks.jlab.org/entry/4024906 5C11b] and [https://logbooks.jlab.org/entry/4024918 radiator harp]. [https://logbooks.jlab.org/entry/4025018 The beam convergence looks good].
 
* Harp scan (Saturday 1am): [https://logbooks.jlab.org/entry/4024904 5C11], [https://logbooks.jlab.org/entry/4024906 5C11b] and [https://logbooks.jlab.org/entry/4024918 radiator harp]. [https://logbooks.jlab.org/entry/4025018 The beam convergence looks good].
 +
* [https://logbooks.jlab.org/entry/4025692 Transmission rates are stable]
  
 
=== Issues ===
 
=== Issues ===
 
* [https://logbooks.jlab.org/entry/4024608 CDC HV needs to be slowly ramped up after a trip]
 
* [https://logbooks.jlab.org/entry/4024608 CDC HV needs to be slowly ramped up after a trip]
 +
* [https://logbooks.jlab.org/entry/4025637 RCDB error], [https://logbooks.jlab.org/entry/4025556 Account from owl shift leader]
 +
* [https://logbooks.jlab.org/entry/4025405 Calorimeter LED pulsing was off and then reestablished]
 +
* MCC waits for a trip to put the dumplette in. When beam is trippy, it is not a long wait, but Eugene had to wait 15min. Is that a good policy to save on 1 trip every ~3h? (15min/(number of running hall)=5min BANU. One trip is typically 30s).
 +
 
=== Plans ===
 
=== Plans ===
* Monday day: 5 -> 4 pass change for Hall C (Around 4h. Mostly invasive).
+
* Today's 5 -> 4 pass change for Hall C is postponed to tomorrow. Consequently, 4 -> 3 pass change next Monday will likely be postponed to Tuesday too (So Monday 15th becomes a good day for a TAC run).  
 
**Malte will change a couple of PMT basis in FCal.
 
**Malte will change a couple of PMT basis in FCal.
 
* Production on Pb target.
 
* Production on Pb target.
 +
** We are now doing para/para/perp/perp/amo
 +
** Run event goals are 50% higher (360M for diamond, 90M for amo)
 +
* [http://accboard.acc.jlab.org/ Thursday 11th will probably be a maintenance day.]
  
 
= Friday August 5 =
 
= Friday August 5 =
Line 64: Line 122:
 
* TAC run in the afternoon ? (Thunderstorms forecast), or production on Pb.
 
* TAC run in the afternoon ? (Thunderstorms forecast), or production on Pb.
 
* No RC meetings this week-end (unless some problem occurs).
 
* No RC meetings this week-end (unless some problem occurs).
* Monday day (or possibly Tuesday): 5 -> 4 pass change for Hall C (Around 4h. Mostly invasive).
+
* Monday day: 5 -> 4 pass change for Hall C (Around 4h. Mostly invasive).
  
 
= Thursday August 4 =
 
= Thursday August 4 =

Latest revision as of 09:39, 10 August 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Wednesday August 10

Past 24 hours

  • Pass change for Hall C (8:30am-13:30)
  • Harp scans when the beam came back.
  • Running on Pb target (30 nA). Another relatively good day: ABU=13.9h for the day (minus 4h of pass change -> 70% efficiency). Overall, quite a good week: ABU=103h for the week (64% efficiency).

Shift Reports

Reports

Issues

  • TAGH major link alarm. Description by shift leader. Cannot communicate with crate, but rates are fine -> we decided to run as it is (monitoring TAGH scalars with stripcharts) and have a look latter.
  • Last night, had to wait again with beam down for 15min for a trip to be allowed to insert amorphous radiator. RC wrote again to Hall D ops contact and PD to ask for this policy to be amended. RC will complain at the weekly 1:30pm MCC meeting.

Plans

  • Production on Pb target. We will not switch to empty target tomorrow as initially considered.
  • Tomorrow (Thursday 11th): maintenance day starting at 6:30am.
    • Solenoid current to be lowered because of cryowork.
  • Next pass change (4->3) for Hall C will be Tuesday. They will be down for 6h-8h Monday to install their aerogel. Monday is auspicious for a TAC run.

Tuesday August 9

Past 24 hours

  • Running on Pb target (30 nA). Very good running: ABU=17.1h (71% efficiency)

Shift Reports

Reports

Issues

Plans

  • Today: 5 -> 4 pass change for Hall C. Starts at 8:30am.
    • Malte will change a couple of PMT basis in FCal.
  • Harp scans after the beam pass change, then back to Production on Pb target. When do we switch to empty target?
  • Thursday 11th: maintenance day starting at 6:30am.
    • Solenoid current to be lowered because of cryowork.
  • Next pass change (4->3) for Hall C will be Tuesday. They will likely be down for 6h-8h Monday to install their aerogel (unless they run with perfect efficiency, in which case they may

do it Friday. This is very unlikely). So, Monday appears to be auspicious for a TAC run.

Monday August 8

Past 72 hours

  • Running on empty target until Friday morning, 7:15am.
  • No beam until Saturday 1am due to RF-recovery (Friday 7:15-11am) and then several accelerator problems (RF-recovery recovery, storm). Then, very good beam (in terms of ABU, trip rate and stability)
  • From Saturday 1am, production on Pb target (30nA)
  • 40.1h of ABU (59% efficiency).

Shift Reports

Reports

Issues

Plans

  • Today's 5 -> 4 pass change for Hall C is postponed to tomorrow. Consequently, 4 -> 3 pass change next Monday will likely be postponed to Tuesday too (So Monday 15th becomes a good day for a TAC run).
    • Malte will change a couple of PMT basis in FCal.
  • Production on Pb target.
    • We are now doing para/para/perp/perp/amo
    • Run event goals are 50% higher (360M for diamond, 90M for amo)
  • Thursday 11th will probably be a maintenance day.

Friday August 5

Past 24 hours

  • Running on empty target (60 nA).
  • Plan to do TAC run Thursday was postponed (Today, or around Aug. 15th).
  • Everything is going well: 15.1h of ABU (63% efficiency). Time loss mostly due to thunderstorm (3h).

Shift Reports

Reports

  • No report today?

Issues

Plans

  • RF recovery until ~noon +/- 1h. Hall C planned to be down until 1pm.
  • Access to put back Pb target if no TAC run today?
  • TAC run in the afternoon ? (Thunderstorms forecast), or production on Pb.
  • No RC meetings this week-end (unless some problem occurs).
  • Monday day: 5 -> 4 pass change for Hall C (Around 4h. Mostly invasive).

Thursday August 4

Past 24 hours

  • Running on empty target (60 nA). Everything is going nicely and smoothly: 16.6h of ABU (69% efficiency).

Shift Reports

Reports

Issues

Plans

  • Production running on empty target until Thursday
  • Thursday morning, TAC run starting ~9am? (7-8 hours, assuming stable beam)
  • RF Recovery for 4hrs on Friday to prepare for weekend. Starts at 7:15am.
  • Monday day: 5 -> 4 pass change for Hall C (Around 4h. Mostly invasive).