(Friday, August 7)
(Monday, August 10)
Line 6: Line 6:
  
 
# Last 72 hours
 
# Last 72 hours
#* Beam returned Friday 4pm?
+
#* Beam returned Saturday 4am
 +
#* [https://logbooks.jlab.org/entry/3822407 Harp scan]
 +
#* DAQ/HOSS problem: [https://logbooks.jlab.org/entry/3822565], [https://logbooks.jlab.org/entry/3822610]
 +
#* Start of 350nA production cycle
 +
#* Saturday swing: [https://logbooks.jlab.org/entry/3822570 AC bias testing], [https://logbooks.jlab.org/entry/3822726]
 
# Reports/Issues
 
# Reports/Issues
 +
#* Monitoring: [https://logbooks.jlab.org/entry/3822741 Saturday 5pm]
 
# Run Plan
 
# Run Plan
 
  
 
==  Friday, August 7 ==  
 
==  Friday, August 7 ==  

Revision as of 18:10, 8 August 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

Monday, August 10

  1. Last 72 hours
  2. Reports/Issues
  3. Run Plan

Friday, August 7

  1. Last 24 hours
    • Diamond alignment check (Hovanes)
      • Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
      • Add screen shots of the coherent edges to logbook
      • "force para" or "force perp", as appropriate, and "save as default" for each of the four settings
    • Trigger check-out (Sasha)
    • TagH and PS HV scan, interrupted by pass change
    • Storm, optics tuning, several issues, transformer repair
    • No beam since, expected only this afternoon
  2. Reports/Issues
  3. Run Plan
    • Access?
    • Harp Scan
    • Complete first production cycle with 350nA

Thursday, August 6

  1. Last 24 hours
    • 5th pass separator problems after thunderstorm in the evening
    • Beam recovered around midnight
    • Harp scan: results
    • Radiation levels checked: similar to spring
  2. Reports/Issues
  3. Run Plan
    • Diamond alignment (Hovanes)
    • Trigger, PS, TagH check (Sasha)
    • Pass change at noon