Difference between revisions of "Run Planning Meeting Notes, August 6 - 12, 2020"
From GlueXWiki
(→Monday, August 10) |
(→Monday, August 10) |
||
Line 8: | Line 8: | ||
#* Beam returned Saturday 4am | #* Beam returned Saturday 4am | ||
#* [https://logbooks.jlab.org/entry/3822407 Harp scan], initially problems with GUI settings | #* [https://logbooks.jlab.org/entry/3822407 Harp scan], initially problems with GUI settings | ||
− | #* DAQ/HOSS | + | #* DAQ/HOSS problems: [https://logbooks.jlab.org/entry/3822565], [https://logbooks.jlab.org/entry/3822610] (Saturday morning) |
#* Start of 350nA production cycle on Saturday day shift, but beam tuning to A ongoing [https://logbooks.jlab.org/entry/3822733] | #* Start of 350nA production cycle on Saturday day shift, but beam tuning to A ongoing [https://logbooks.jlab.org/entry/3822733] | ||
#* Saturday swing: [https://logbooks.jlab.org/entry/3822570 AC bias testing], [https://logbooks.jlab.org/entry/3822726], [https://logbooks.jlab.org/entry/3823910 status] | #* Saturday swing: [https://logbooks.jlab.org/entry/3822570 AC bias testing], [https://logbooks.jlab.org/entry/3822726], [https://logbooks.jlab.org/entry/3823910 status] | ||
Line 16: | Line 16: | ||
# Reports/Issues | # Reports/Issues | ||
#* Coherent edge for -45/45: [https://logbooks.jlab.org/entry/3823397] | #* Coherent edge for -45/45: [https://logbooks.jlab.org/entry/3823397] | ||
+ | #* DAQ/HOSS problems again on Monday morning: [https://logbooks.jlab.org/entry/3823863], [https://logbooks.jlab.org/entry/3823933] | ||
#* Monitoring: [https://logbooks.jlab.org/entry/3822741 Saturday 5pm], [https://logbooks.jlab.org/entry/3823261 Sunday 5am], [https://logbooks.jlab.org/entry/3823563 Sunday 5pm] | #* Monitoring: [https://logbooks.jlab.org/entry/3822741 Saturday 5pm], [https://logbooks.jlab.org/entry/3823261 Sunday 5am], [https://logbooks.jlab.org/entry/3823563 Sunday 5pm] | ||
# Run Plan | # Run Plan |
Revision as of 07:51, 10 August 2020
<- Back to Run Coordination Meetings:Summer2020
Monday, August 10
- Last 72 hours
- Beam returned Saturday 4am
- Harp scan, initially problems with GUI settings
- DAQ/HOSS problems: [1], [2] (Saturday morning)
- Start of 350nA production cycle on Saturday day shift, but beam tuning to A ongoing [3]
- Saturday swing: AC bias testing, [4], status
- MCC confused about FSD trip and goniometer movements: [5]
- Sunday 1pm: Cryoleak in 1L20, tripped pump, beam restored at 10pm
- Completed first full cycle of 4 orientations + amorphous
- Reports/Issues
- Coherent edge for -45/45: [6]
- DAQ/HOSS problems again on Monday morning: [7], [8]
- Monitoring: Saturday 5pm, Sunday 5am, Sunday 5pm
- Run Plan
Friday, August 7
- Last 24 hours
- Diamond alignment check (Hovanes)
- Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
- Add screen shots of the coherent edges to logbook
- "force para" or "force perp", as appropriate, and "save as default" for each of the four settings
- Trigger check-out (Sasha)
- TagH and PS HV scan, interrupted by pass change
- Storm, optics tuning, several issues, transformer repair
- No beam since, expected only this afternoon
- Diamond alignment check (Hovanes)
- Reports/Issues
- Remind MCC to put in dumplet when changing radiators
- BCal Pulser?
- Monitoring:
- CPP Status
- Run Plan
- Access?
- Harp Scan
- Complete first production cycle with 350nA
Thursday, August 6
- Last 24 hours
- 5th pass separator problems after thunderstorm in the evening
- Beam recovered around midnight
- Harp scan: results
- Radiation levels checked: similar to spring
- Reports/Issues
- TagM was set to high gain mode during night, saturates, no meaningful data [9]
- Diamond alignment: coherent edge too far off (Beni)
- Bleed through from Hall B
- Run Plan
- Diamond alignment (Hovanes)
- Trigger, PS, TagH check (Sasha)
- Pass change at noon