(Monday, August 10)
 
Line 50: Line 50:
 
#* DAQ/HOSS problems: [https://logbooks.jlab.org/entry/3822565], [https://logbooks.jlab.org/entry/3822610] (Saturday morning)
 
#* DAQ/HOSS problems: [https://logbooks.jlab.org/entry/3822565], [https://logbooks.jlab.org/entry/3822610] (Saturday morning)
 
#* Start of 350nA production cycle on Saturday day shift, but beam tuning to A ongoing [https://logbooks.jlab.org/entry/3822733]
 
#* Start of 350nA production cycle on Saturday day shift, but beam tuning to A ongoing [https://logbooks.jlab.org/entry/3822733]
#* Saturday swing: [https://logbooks.jlab.org/entry/3822570 AC bias testing], [https://logbooks.jlab.org/entry/3822726], [https://logbooks.jlab.org/entry/3823910 status]
+
#* Saturday swing: [https://logbooks.jlab.org/entry/3822570 AC bias testing], [https://logbooks.jlab.org/entry/3822726], [https://logbooks.jlab.org/entry/3823910 status], [https://logbooks.jlab.org/entry/3823602], [https://logbooks.jlab.org/entry/3823599]
 
#* MCC confused about FSD trip and goniometer movements: [https://logbooks.jlab.org/entry/3822898]
 
#* MCC confused about FSD trip and goniometer movements: [https://logbooks.jlab.org/entry/3822898]
 
#* Sunday 1pm: Cryoleak in 1L20, tripped pump, beam restored at 10pm
 
#* Sunday 1pm: Cryoleak in 1L20, tripped pump, beam restored at 10pm

Latest revision as of 11:43, 12 August 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet

Wednesday, August 12

  1. Last 24 hours
    • TagM card replacements (Richard, Nick, Chris) [1]
    • Test crystals installed [2]
    • Beam tuning throughout the night
    • 8pm: Harp scan attempt, motor stuck [3], [4], done at 10:30pm
    • 2:45am: Harp scan [5]
    • 6:00am: Production
  2. Reports/Issues
    • DIRC HV off during night
  3. Run Plan
    • Moving beam spot on diamond during Hovanes' shift
    • Production
    • Tuesday: Pass change for Hall C ?
  4. AOB
    • Thanks to all on-site and monitoring shift crews, experts on call and everybody working in the hall
    • Next RC: Bill Li

Tuesday, August 11

  1. Last 24 hours
    • 11:45am: 5th pass separator cable melting [6], [7]
    • 7:45pm: beam returned, continued production running
    • 4:00am: 5th pass separator trip, crew chief gives Hall D priority with magnetic separation
    • 6:00am: separator repaired, switch back to RF separation
  2. Reports/Issues
  3. Run plan
    • Maintenance day (>4h):
      • Intervention on TagM (Richard, Nick, Chris)
      • Installation of test crystals (Sasha)
      • Work on GEM TRD (Lubomir)
      • FCal base replacements (Mark)
    • Tune beam spot on diamond for 45/135 (Hovanes)?

Monday, August 10

  1. Last 72 hours
    • Beam returned Saturday 4am
    • Harp scan, initially problems with GUI settings
    • DAQ/HOSS problems: [9], [10] (Saturday morning)
    • Start of 350nA production cycle on Saturday day shift, but beam tuning to A ongoing [11]
    • Saturday swing: AC bias testing, [12], status, [13], [14]
    • MCC confused about FSD trip and goniometer movements: [15]
    • Sunday 1pm: Cryoleak in 1L20, tripped pump, beam restored at 10pm
    • Harp scan: [16], [17], [18]
    • Completed first full cycle of 4 orientations + amorphous
    • DAQ problems on Monday morning: [19], [20], log files from moving to tape fill up disk, Sergey will work on a system to prevent this
  2. Reports/Issues
  3. Run Plan
    • Continue production
    • Maintenance day on Tuesday:
      • Intervention on TagM (Richard, Chris)
      • Installation of test crystals (Sasha)
      • Work on GEM TRD (Lubomir)

Friday, August 7

  1. Last 24 hours
    • Diamond alignment check (Hovanes)
      • Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
      • Add screen shots of the coherent edges to logbook
      • "force para" or "force perp", as appropriate, and "save as default" for each of the four settings
    • Trigger check-out (Sasha)
    • TagH and PS HV scan, interrupted by pass change
    • Storm, optics tuning, several issues, transformer repair
    • No beam since, expected only this afternoon
  2. Reports/Issues
  3. Run Plan
    • Access?
    • Harp Scan
    • Complete first production cycle with 350nA

Thursday, August 6

  1. Last 24 hours
    • 5th pass separator problems after thunderstorm in the evening
    • Beam recovered around midnight
    • Harp scan: results
    • Radiation levels checked: similar to spring
  2. Reports/Issues
  3. Run Plan
    • Diamond alignment (Hovanes)
    • Trigger, PS, TagH check (Sasha)
    • Pass change at noon