Run Planning Meeting Notes, August 6 - 12, 2020

From GlueXWiki
Revision as of 08:40, 7 August 2020 by Aaustreg (Talk | contribs)

Jump to: navigation, search

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

Friday, August 7

  1. Last 24 hours
    • Diamond alignment check (Hovanes)
      • Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
      • Add screen shots of the coherent edges to logbook
      • "force para/perp" and "save as default" for each of the four settings
    • Trigger check-out (Sasha)
    • TagH and PS HV scan, interrupted by pass change
    • Storm, optics tuning, several issues, transformer repair
    • No beam since, expected only this afternoon
  2. Reports/Issues
  3. Run Plan
    • Access?
    • Harp Scan
    • Complete first production cycle with 350nA

Thursday, August 6

  1. Last 24 hours
    • 5th pass separator problems after thunderstorm in the evening
    • Beam recovered around midnight
    • Harp scan: results
    • Radiation levels checked: similar to spring
  2. Reports/Issues
  3. Run Plan
    • Diamond alignment (Hovanes)
    • Trigger, PS, TagH check (Sasha)
    • Pass change at noon