Difference between revisions of "Run Planning Meeting Notes, Dec 13-Dec 19, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, Dec 13 at 8:45)
(Friday, Dec 14 at 8:45)
Line 13: Line 13:
  
 
==Friday, Dec 14 at 8:45 ==
 
==Friday, Dec 14 at 8:45 ==
 +
# With a 8.9 GeV beam, the field in the tagger quad should be reduced from -4.2A to -3.1A. (R.Jones)
 +
 
==Monday, Dec 17 at 8:45 ==
 
==Monday, Dec 17 at 8:45 ==
 
==Tuesday, Dec 18 at 8:45 ==
 
==Tuesday, Dec 18 at 8:45 ==
 
==Wednesday, Dec 19 at 8:45 ==
 
==Wednesday, Dec 19 at 8:45 ==

Revision as of 13:19, 13 December 2018

Thursday, Dec 13 at 8:45

  1. Wednesday - Thursday morning
    • 15:40 MCC starts calibrating our ion chambers
    • ion chambers were calibrated for all for radiator positions, followed by harp scans
    • 18:14 requesting beam for physics
    • 19:17 developing TOF HV trouble; eventually Nick had to be called; he came in and replaced a card
    • there seems to have been a new CODA update been committed to the DAQ; DAQ started out not working; Sashsa fixed it.
    • ...
  2. Issues:
    • some rcdb error during run starts
    • comments typed during run start don't make it into the record
    • 6:30 am text message to RSC phone; can we stop that

Friday, Dec 14 at 8:45

  1. With a 8.9 GeV beam, the field in the tagger quad should be reduced from -4.2A to -3.1A. (R.Jones)

Monday, Dec 17 at 8:45

Tuesday, Dec 18 at 8:45

Wednesday, Dec 19 at 8:45