(Friday, Dec 14 at 8:45)
(Friday, Dec 14 at 8:45)
Line 15: Line 15:
 
# With a 8.9 GeV beam, the field in the tagger quad should be reduced from -4.2A to -3.1A. (R.Jones)
 
# With a 8.9 GeV beam, the field in the tagger quad should be reduced from -4.2A to -3.1A. (R.Jones)
 
# run plan calls for LH2 at 5% higher temp. C. Keith says the temperature can be raised without too much difficulty. He'll leave instructions with os on Friday.
 
# run plan calls for LH2 at 5% higher temp. C. Keith says the temperature can be raised without too much difficulty. He'll leave instructions with os on Friday.
 +
# Weekend plan (current):
 +
#* finish empty target at 100 nA on 1e-4 radiator
 +
#* ~ 9:am set up for TAC run: empty target, 2e-5 radiator, 2 nA beam; take ~ 8h ABU
 +
#* Compton: LH2 target, 30 nA, 1e-4 radiator; take ~ 8h ABU
 +
#* Target density monitoring: raise LH2 target T by 5%, 100 nA, 1e-4 radiator; take ~ 8h ABU
 +
#* another TAC run: 2 nA, 2e-5 radiator, target still at +5%????
 +
#* CompCal as TAC 2 nA, 2e-5 radiator, empty target
  
 
==Monday, Dec 17 at 8:45 ==
 
==Monday, Dec 17 at 8:45 ==
 
==Tuesday, Dec 18 at 8:45 ==
 
==Tuesday, Dec 18 at 8:45 ==
 
==Wednesday, Dec 19 at 8:45 ==
 
==Wednesday, Dec 19 at 8:45 ==

Revision as of 09:37, 14 December 2018

Thursday, Dec 13 at 8:45

  1. Wednesday - Thursday morning
    • 15:40 MCC starts calibrating our ion chambers
    • ion chambers were calibrated for all for radiator positions, followed by harp scans
    • 18:14 requesting beam for physics
    • 19:17 developing TOF HV trouble; eventually Nick had to be called; he came in and replaced a card
    • there seems to have been a new CODA update been committed to the DAQ; DAQ started out not working; Sashsa fixed it.
    • ...
  2. Issues:
    • some rcdb error during run starts
    • comments typed during run start don't make it into the record
    • 6:30 am text message to RSC phone; can we stop that

Friday, Dec 14 at 8:45

  1. With a 8.9 GeV beam, the field in the tagger quad should be reduced from -4.2A to -3.1A. (R.Jones)
  2. run plan calls for LH2 at 5% higher temp. C. Keith says the temperature can be raised without too much difficulty. He'll leave instructions with os on Friday.
  3. Weekend plan (current):
    • finish empty target at 100 nA on 1e-4 radiator
    • ~ 9:am set up for TAC run: empty target, 2e-5 radiator, 2 nA beam; take ~ 8h ABU
    • Compton: LH2 target, 30 nA, 1e-4 radiator; take ~ 8h ABU
    • Target density monitoring: raise LH2 target T by 5%, 100 nA, 1e-4 radiator; take ~ 8h ABU
    • another TAC run: 2 nA, 2e-5 radiator, target still at +5%????
    • CompCal as TAC 2 nA, 2e-5 radiator, empty target