(Created page with "=Wed, Dec 5 at 8:45 == # Several items are fixed during controlled access #* Completed at 6pm yesterday # First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3...")
 
(Wed, Dec 5 at 8:45 =)
Line 1: Line 1:
 
=Wed, Dec 5 at 8:45 ==
 
=Wed, Dec 5 at 8:45 ==
# Several items are fixed during controlled access
+
# Several items were fixed during a controlled access in the morning
#* Completed at 6pm yesterday
+
#* Amorphous radiator ladder
#  First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
+
#* A few bad FCAL bases were replaced
# Swing and Overnight Running
+
#* CCAL LED trigger time delay was adjusted
#* 15 nA on Al V-wire ([https://logbooks.jlab.org/entry/3633248 full running condition]).
+
# Production trigger rate study was performed during afternoon
#* Lost beam around 2am (due to radiation damaged valve position sensor).
+
#*
# FCAL is down:
+
#* [https://logbooks.jlab.org/entry/3633312 Monitoring current draw on CAN bus] [Matt]
+
#* Rapid access is arrange between 10am - noon.
+
# Run Plan:
+
#* https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf
+
#* Beam requested today: 2nA on the foil.
+
# Cryo
+
#* solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314
+

Revision as of 19:44, 5 December 2018

Wed, Dec 5 at 8:45 =

  1. Several items were fixed during a controlled access in the morning
    • Amorphous radiator ladder
    • A few bad FCAL bases were replaced
    • CCAL LED trigger time delay was adjusted
  2. Production trigger rate study was performed during afternoon