Revision as of 19:45, 5 December 2018

Wed, Dec 5 at 8:45

  1. Several items were fixed during a controlled access in the morning
    • Amorphous radiator ladder
    • A few bad FCAL bases were replaced
    • CCAL LED trigger time delay was adjusted
  2. Production trigger rate study was performed during afternoon