Difference between revisions of "Run Planning Meeting Notes, Dec 5-Dec 11, 2018"

From GlueXWiki
Jump to: navigation, search
(Wed, Dec 5 at 8:45 =)
(Wed, Dec 5 at 8:45)
Line 1: Line 1:
 
==Wed, Dec 5 at 8:45 ==
 
==Wed, Dec 5 at 8:45 ==
 
# Several items were fixed during a controlled access in the morning
 
# Several items were fixed during a controlled access in the morning
#* Amorphous radiator ladder
+
#* Amorphous radiator ladder by Hovanes and Scot
#* A few bad FCAL bases were replaced
+
#* Colin replaced a few bad FCAL bases
#* CCAL LED trigger time delay was adjusted
+
#* Sasha adjusted CCAL LED trigger time delay
# Production trigger rate study was performed during afternoon  
+
# Production trigger rate study was performed by Sasha during afternoon and evening
 
#*
 
#*
 +
# MCC plan for the coming week
 +
#* MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
 +
#* On Dec 9 (Monday), the beam will be off at 6:00am. MCC will start change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).

Revision as of 21:35, 5 December 2018

Wed, Dec 5 at 8:45

  1. Several items were fixed during a controlled access in the morning
    • Amorphous radiator ladder by Hovanes and Scot
    • Colin replaced a few bad FCAL bases
    • Sasha adjusted CCAL LED trigger time delay
  2. Production trigger rate study was performed by Sasha during afternoon and evening
  3. MCC plan for the coming week
    • MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
    • On Dec 9 (Monday), the beam will be off at 6:00am. MCC will start change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).