Difference between revisions of "Run Planning Meeting Notes, Dec 5-Dec 11, 2018"
From GlueXWiki
(→Wed, Dec 5 at 8:45 =) |
(→Wed, Dec 5 at 8:45) |
||
Line 1: | Line 1: | ||
==Wed, Dec 5 at 8:45 == | ==Wed, Dec 5 at 8:45 == | ||
# Several items were fixed during a controlled access in the morning | # Several items were fixed during a controlled access in the morning | ||
− | #* Amorphous radiator ladder | + | #* Amorphous radiator ladder by Hovanes and Scot |
− | #* | + | #* Colin replaced a few bad FCAL bases |
− | #* CCAL LED trigger time delay | + | #* Sasha adjusted CCAL LED trigger time delay |
− | # Production trigger rate study was performed during afternoon | + | # Production trigger rate study was performed by Sasha during afternoon and evening |
#* | #* | ||
+ | # MCC plan for the coming week | ||
+ | #* MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D). | ||
+ | #* On Dec 9 (Monday), the beam will be off at 6:00am. MCC will start change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12). |
Revision as of 21:35, 5 December 2018
Wed, Dec 5 at 8:45
- Several items were fixed during a controlled access in the morning
- Amorphous radiator ladder by Hovanes and Scot
- Colin replaced a few bad FCAL bases
- Sasha adjusted CCAL LED trigger time delay
- Production trigger rate study was performed by Sasha during afternoon and evening
- MCC plan for the coming week
- MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
- On Dec 9 (Monday), the beam will be off at 6:00am. MCC will start change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).