(Wed, Dec 5 at 8:45)
(Wed, Dec 5 at 8:45)
Line 8: Line 8:
 
# MCC plan for the coming week
 
# MCC plan for the coming week
 
#* MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
 
#* MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
#* On Dec 9 (Monday), the beam will be off at 6:00am. MCC will start change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).
+
#* On Dec 9 (Monday), the beam will be off at 6:00am. MCC will change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).
 +
 
 +
# Tagger scaler distribution appeared to rise at the high energy end. Richard said that he made some changes this morning and he will take a look at it when he gets chance.

Revision as of 21:42, 5 December 2018

Wed, Dec 5 at 8:45

  1. Several items were fixed during a controlled access in the morning
    • Amorphous radiator ladder by Hovanes and Scot
    • Colin replaced a few bad FCAL bases
    • Sasha adjusted CCAL LED trigger time delay
  2. Production trigger rate study was performed by Sasha during afternoon and evening
  3. MCC plan for the coming week
    • MCC will continuously deliver beam throughout the rest of week with 1.83 GeV/pass (10.3 GeV for Hall D).
    • On Dec 9 (Monday), the beam will be off at 6:00am. MCC will change energy to 1.61 GeV/pass (9 GeV for hall D). This process is planned for three days (DeC 9-12).
  1. Tagger scaler distribution appeared to rise at the high energy end. Richard said that he made some changes this morning and he will take a look at it when he gets chance.