Run Planning Meeting Notes, Dec 5-Dec 11, 2018

From GlueXWiki
Revision as of 19:32, 5 December 2018 by Lgan (Talk | contribs) (Created page with "=Wed, Dec 5 at 8:45 == # Several items are fixed during controlled access #* Completed at 6pm yesterday # First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Wed, Dec 5 at 8:45 =

  1. Several items are fixed during controlled access
    • Completed at 6pm yesterday
  2. First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
  3. Swing and Overnight Running
    • 15 nA on Al V-wire (full running condition).
    • Lost beam around 2am (due to radiation damaged valve position sensor).
  4. FCAL is down:
  5. Run Plan:
  6. Cryo