Run Planning Meeting Notes, Dec 5-Dec 11, 2018
From GlueXWiki
Revision as of 19:32, 5 December 2018 by Lgan (Talk | contribs) (Created page with "=Wed, Dec 5 at 8:45 == # Several items are fixed during controlled access #* Completed at 6pm yesterday # First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3...")
Wed, Dec 5 at 8:45 =
- Several items are fixed during controlled access
- Completed at 6pm yesterday
- First sight of beam (by Comp Cal): https://logbooks.jlab.org/entry/3633247
- Swing and Overnight Running
- 15 nA on Al V-wire (full running condition).
- Lost beam around 2am (due to radiation damaged valve position sensor).
- FCAL is down:
- Monitoring current draw on CAN bus [Matt]
- Rapid access is arrange between 10am - noon.
- Run Plan:
- https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2018-v5.pdf
- Beam requested today: 2nA on the foil.
- Cryo
- solenoid helium fill test this morning: https://logbooks.jlab.org/entry/3633314