=Friday December 17=
 +
 +
#Last 24h:
 +
#* Smooth production on LD<sub>2</sub> at 140 nA, 0/90 para and perp. Took one amorphous run (90578).
 +
#Issues
 +
#*
 +
#Plans
 +
#* Continue running on LD<sub>2</sub> at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).
 +
#* Target change LD<sub>2</sub> → L<sup>4</sup>He:
 +
#** If an empty target run is desirable, start empty the target and turn off pulse refrigerator at 1:45pm (assuming a 2h run). Otherwise, start empty/pulse refr. off at 3:45.
 +
#** 2pm-4pm: 2h empty target run?
 +
#** 4pm. Chris Carlin goes in the Hall to start switching gas. Rapid access. Solenoid is on (be aware of magnetic field fringes). 
 +
#** Between 5pm and 6pm: Chris is done switching gas. End of rapid access.
 +
#** Ask for beam. (No need for beam restoration check as the beam down time is small): while the target cools down. A. Somov will take test data.
 +
#* around 9pm: target is cold. Start running on L<sup>4</sup>He at 150 nA, 0/90 para and perp.
 +
 
=Thursday December 16=
 
=Thursday December 16=
  
Line 7: Line 23:
 
#* JD70-105 degradation: [https://logbooks.jlab.org/entry/3963658 Hovanes tried to find a new location that improved the 0/90 para and 45/135 para/perp coherent peaks, but to no avail.]  
 
#* JD70-105 degradation: [https://logbooks.jlab.org/entry/3963658 Hovanes tried to find a new location that improved the 0/90 para and 45/135 para/perp coherent peaks, but to no avail.]  
 
#* Target lost the Labview readout twice last night ([https://logbooks.jlab.org/entry/3963985 2:20am] and [https://logbooks.jlab.org/entry/3964080 5:50am]). Chris Carlin came the first time and [https://logbooks.jlab.org/entry/3964024 fixed it]. The second time, we fixed it following his instruction and [https://logbooks.jlab.org/entry/3964155 it worked].  
 
#* Target lost the Labview readout twice last night ([https://logbooks.jlab.org/entry/3963985 2:20am] and [https://logbooks.jlab.org/entry/3964080 5:50am]). Chris Carlin came the first time and [https://logbooks.jlab.org/entry/3964024 fixed it]. The second time, we fixed it following his instruction and [https://logbooks.jlab.org/entry/3964155 it worked].  
#* Rates are ~10% lower compared to previous LD<sub>2</sub> data taking period, see [https://halldweb.jlab.org/wiki/images/a/a3/Rate.png here]. Part of it is lower transmission but even accounting for this, normalized rates remains 6% lower (see trigger/PS, black disk symbols,  [https://halldweb.jlab.org/wiki/images/d/da/Rates_ratios.png here]).
+
#* Rates are ~10% lower compared to previous LD<sub>2</sub> data taking period, see [https://halldweb.jlab.org/wiki/images/a/a3/Rate.png here]. Part of it is lower transmission but even accounting for this, normalized rates remains 6% lower (see trigger/PS, black disk symbols,  [https://halldweb.jlab.org/wiki/images/d/da/Rates_ratios.png here]). The comparison between the time-evolution of the Trigger/PS rates for diamond and amorphous radiators shows that the (non-transmission) drop is due to the diamond deterioration rather than detector deterioration. 
 
#Plans
 
#Plans
 
#* Continue running on LD<sub>2</sub> at 140 nA, 0/90 para and perp. Do one amorphous run today.
 
#* Continue running on LD<sub>2</sub> at 140 nA, 0/90 para and perp. Do one amorphous run today.
 
#* Discussion on possible target change to L<sup>4</sup>He.  
 
#* Discussion on possible target change to L<sup>4</sup>He.  
 
#* Status of possible CPP test.
 
#* Status of possible CPP test.

Revision as of 18:52, 16 December 2021

Friday December 17

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. Took one amorphous run (90578).
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp until 1:45pm (if empty target run is needed) or 3:45pm (if not).
    • Target change LD2 → L4He:
      • If an empty target run is desirable, start empty the target and turn off pulse refrigerator at 1:45pm (assuming a 2h run). Otherwise, start empty/pulse refr. off at 3:45.
      • 2pm-4pm: 2h empty target run?
      • 4pm. Chris Carlin goes in the Hall to start switching gas. Rapid access. Solenoid is on (be aware of magnetic field fringes).
      • Between 5pm and 6pm: Chris is done switching gas. End of rapid access.
      • Ask for beam. (No need for beam restoration check as the beam down time is small): while the target cools down. A. Somov will take test data.
    • around 9pm: target is cold. Start running on L4He at 150 nA, 0/90 para and perp.

Thursday December 16

  1. Last 24h:
    • Smooth production on LD2 at 140 nA, 0/90 para and perp. Interrupted only by search for better spot on diamond (~1h see below) and ~1h of RF-related down time.
    • Spectra from A. Somov.
  2. Issues
  3. Plans
    • Continue running on LD2 at 140 nA, 0/90 para and perp. Do one amorphous run today.
    • Discussion on possible target change to L4He.
    • Status of possible CPP test.