Difference between revisions of "Run Planning Meeting Notes, December 7 - December 14, 2022"

From GlueXWiki
Jump to: navigation, search
(Created page with "= Thursday Dec. 8th = === Last 24h === *Wednesday was RF recovery day, Hall was in Controlled Access till ~6:30pm, many things where done during access in Hall. **Hall (Contro...")
 
Line 1: Line 1:
 +
Meetings are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meeting ID: 160 199 0060 / Passcode 8394)
 +
 +
[https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard]
 +
 +
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room white board]
 +
 +
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]
 +
 +
 +
 
= Thursday Dec. 8th =
 
= Thursday Dec. 8th =
 
=== Last 24h ===
 
=== Last 24h ===

Revision as of 09:40, 8 December 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook


Thursday Dec. 8th

Last 24h

  • Wednesday was RF recovery day, Hall was in Controlled Access till ~6:30pm, many things where done during access in Hall.
    • Hall (Controlled Access):
      • Tim worked on Tagger magnet NMR [1]
      • Sasha replaced the BCAL fADC [2]
      • DIRC checkout (Justin+1).
      • Sasha, Vlad, Lubomir, Sergei and Arshak: work in the PS test area.
      • Sasha, Arshak and Malte did some preliminary noise level tests at FCAL
      • Mark Stevens: walkthrough for OPS.
      • Tim and Eugene checked the man-lift
      • Tim and Sasha checked by how much FCal can be pushed back (for some tentative PrimEx systematic measurements).
  • After beam comes back:

Shift Summaries

Issues

Short term run plan

  • TAC run?
  • Take date on LHe FULL target at 200nA beam