Wednesday November 9
- Last 24h:
- Issues
- Hall D beam stopper cause almost four hours of down time [5] We recovered the beam at 15:20 pm. The biggest suspect is an air pressure issue that caused a "beam stopper stuck" fault within PLC. The cause needs further investigation.
- Plans
- Beam Studies next Tuesday, Dec 14