#* Hall D beam stopper cause almost four hours of down time [https://logbooks.jlab.org/entry/3959035] We recovered the beam at 15:20 pm. The biggest suspect is an air pressure issue that caused a "beam stopper stuck" fault within PLC. The cause needs further investigation. | #* Hall D beam stopper cause almost four hours of down time [https://logbooks.jlab.org/entry/3959035] We recovered the beam at 15:20 pm. The biggest suspect is an air pressure issue that caused a "beam stopper stuck" fault within PLC. The cause needs further investigation. | ||
− | #* Solenoid dumb due to a lost communication with both VCL flows for over 1 minute [https://logbooks.jlab.org/entry/3959132] (Tim) | + | #* Solenoid dumb due to a lost communication with both VCL flows for over 1 minute [https://logbooks.jlab.org/entry/3959132][https://logbooks.jlab.org/entry/3959165] (Tim & Nick) |
#Plans | #Plans | ||
#* Beam Studies next Tuesday, Dec 14 | #* Beam Studies next Tuesday, Dec 14 |
Revision as of 20:51, 8 December 2021
Wednesday November 9
- Last 24h:
- Issues
- Hall D beam stopper cause almost four hours of down time [5] We recovered the beam at 15:20 pm. The biggest suspect is an air pressure issue that caused a "beam stopper stuck" fault within PLC. The cause needs further investigation.
- Solenoid dumb due to a lost communication with both VCL flows for over 1 minute [6][7] (Tim & Nick)
- Plans
- Beam Studies next Tuesday, Dec 14