Run Planning Meeting Notes, Feb. 14-Fev 21, 2019

From GlueXWiki
Revision as of 09:27, 14 February 2019 by Billlee (Talk | contribs)

Jump to: navigation, search

Thursday, Feb. 14 at 08:45

  1. Past 24 hours:
    • Beam profile:
    • DIRC data taking.
  1. Issues
    • Water Temperature
    • IOC lost comminication
      • IOCHDCOL
    • DIRC SSP problem:
      • DAQ stopped twice due to the out of sync issue.
    • Tagger RF time:


Friday, Feb. 15 at 08:45