Difference between revisions of "Run Planning Meeting Notes, Feb 12-Feb 28, 2018"

From GlueXWiki
Jump to: navigation, search
(Saturday, February 24)
(Tuesday, February 27)
 
(75 intermediate revisions by the same user not shown)
Line 54: Line 54:
  
 
== Saturday, February 24  ==
 
== Saturday, February 24  ==
 +
 +
* No Hall D Counting Room meeting due to Collaboration Meeting
 +
 +
== Sunday, February 25 ==
  
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
#* Production data
 
#* Production data
#* [https://logbooks.jlab.org/entry/3536915 Current timings], [https://logbooks.jlab.org/entry/3536858 CDC and FDC timings]
+
#* [https://logbooks.jlab.org/entry/3537708 Scan result for HALO]
#* [https://halldweb.jlab.org/DocDB/0035/003538/001/stevens_systematics.pdf nA BPM commissioning]  
+
 
# Issues:
 
# Issues:
#* ADC in slot 16 of the TOF crate is still commented out in the config file
+
#* [https://logbooks.jlab.org/entry/3537873 Missing channels on Tagger Miscrope]?
#* [https://logbooks.jlab.org/entry/3536533 FDC TDC-ADC timing shifts]
+
#* [https://logbooks.jlab.org/entry/3537996 FDC Occupancy plots]
# Reports (?):
+
#* [https://logbooks.jlab.org/entry/3538196 Low level monitoring]
#* ROCSTPSC2 (see Feb 23 above) etc, updates?
+
#* FCAL pedestals check - re pi0 peak small shift (Matt's question)
#* TPOL sector 3 updates?
+
#* ADC in slot 16 of the TOF crate is commented out in the config file
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3537316 Hall D Cavity BPMs] initial steps underway, more work on Monday
 +
#* [https://logbooks.jlab.org/entry/3537357 Energy oscillations]
 
#* [https://logbooks.jlab.org/entry/3537161 Beam position update]
 
#* [https://logbooks.jlab.org/entry/3537161 Beam position update]
#* [https://logbooks.jlab.org/entry/3536973 Low level monitoring report]
+
#* [https://logbooks.jlab.org/entry/3537938 AC x-response]
 
# Planning:
 
# Planning:
 +
#* Move collimator+beam
 +
#* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
 +
#* [https://logbooks.jlab.org/entry/3537405 CDC 160 ns shift]: bring window even closer, narrow its width? Revert to CDC integral mode.
 +
#* MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
 
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
#* Harp scan at 7am
+
#* Harp scan in early morning: [https://logbooks.jlab.org/entry/3538262 does not look good]
 
#* Production data
 
#* Production data
#* TAC run planning
+
#* Harp (around noon)
 
+
#* Special CDC run on diamond at 100nA for 30 min (Naomi will analyze)
== Sunday, February 25 ==
+
#* Put profiler in to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes)
 
+
#* Move collimator (Hovanes)
# Notes from the previous 24 hours:
+
#* PS scalers check (Sasha)
 
+
#* Change CDC to integral mode and keep for rest of run (Sasha)
  
 
== Monday, February 26 ==
 
== Monday, February 26 ==
  
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
+
#* Production data
 +
#* [https://logbooks.jlab.org/entry/3538262 Scan result for HALO]
 +
#* [https://logbooks.jlab.org/entry/3538424 New CDC settings]
 +
# Issues:
 +
#* Active Collimator [https://logbooks.jlab.org/entry/3538392 Repair attempt], [https://logbooks.jlab.org/entry/3538402 Beam profiler], [https://logbooks.jlab.org/entry/3538426 Transmission Scan]
 +
#* FCAL pedestals check - re pi0 peak small shift (Matt's question)
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3538314 Collimator position change]
 +
# Planning:
 +
#* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
 +
#* TAC plans
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Harp scan in early morning: [https://logbooks.jlab.org/entry/3538262 yesterday's scan]
 +
#* Production data (until 1pm)
 +
#* During Optics studies (1-3pm)
 +
#**Elton walk through in Hall D and Tagger Hall.
 +
#** MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
 +
#** FCAL bases
 +
#* Production data
  
 
== Tuesday, February 27 ==
 
== Tuesday, February 27 ==
  
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 +
#* Production data
 +
#* [https://logbooks.jlab.org/entry/3538807 Scan result for HALO]
 +
#* Controlled Access
 +
#**[https://logbooks.jlab.org/entry/3538920 Active Collimator adapter replacements]
 +
#** [https://logbooks.jlab.org/entry/3538916 Muon Chamber steel addition] and FCAL IOCs turned off
 +
#** FCAL base work
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3539404 Magnet dump]
 +
#* Trouble starting DAQ: rocps1 and rocps2 configuration files
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3539134 Hall D Cavity BPMs]
 +
#*[https://logbooks.jlab.org/entry/3539550 Flux normalized yields from current scan]
 +
#* Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields
 +
#* [https://logbooks.jlab.org/entry/3537030 Follow-up Re: CDC/FDC timings in 2016 and now]
 +
# Longer Term Planning:
 +
#* FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
 +
#* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
 +
#* TAC plans
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* During magnet ramp up: AC, diamond alignment,...
 +
#* Controlled Access during Tuesday's RF recovery?
 +
#* Harp scan after beam comes back?
 +
#* Production data
  
 
+
== Wednesday, February 28 ==
== Thursday, February 28 ==
+
  
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 +
#* Production data
 +
#* [https://logbooks.jlab.org/entry/3538807 Scan result for HALO]
 +
#* Controlled Access
 +
#** Muon chamber removed
 +
#** FCAL base work
 +
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3539507 Low level monitoring]
 +
# Reports:
 +
#* [https://logbooks.jlab.org/entry/3539134 Hall D Cavity BPMs]
 +
#* Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields
 +
# Longer Term Planning:
 +
#* FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
 +
#* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
 +
#* TAC plans
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Production data

Latest revision as of 10:43, 27 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 22

  1. Notes from the previous 24 hours:
    • Continued production data until 1:30pm
    • Secretary Perry toured Hall D
    • Beam delivery shaky: Swing shift summary
    • DAQ/cMesg/rootSPY issues
    • Dipole trip
    • Transmission looks ok
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan once beam returns
    • Production data

Friday, February 23

  1. Notes from the previous 24 hours:
    • Production data
    • Beam taken away 11:15-14:14 for linac issues
    • Owl Shift Summary: rho, omega, phi triggers
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data

Saturday, February 24

  • No Hall D Counting Room meeting due to Collaboration Meeting

Sunday, February 25

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • Move collimator+beam
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • CDC 160 ns shift: bring window even closer, narrow its width? Revert to CDC integral mode.
    • MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning: does not look good
    • Production data
    • Harp (around noon)
    • Special CDC run on diamond at 100nA for 30 min (Naomi will analyze)
    • Put profiler in to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes)
    • Move collimator (Hovanes)
    • PS scalers check (Sasha)
    • Change CDC to integral mode and keep for rest of run (Sasha)

Monday, February 26

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • TAC plans
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning: yesterday's scan
    • Production data (until 1pm)
    • During Optics studies (1-3pm)
      • Elton walk through in Hall D and Tagger Hall.
      • MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
      • FCAL bases
    • Production data

Tuesday, February 27

  1. Notes from the previous 24 hours:
  2. Issues:
    • Magnet dump
    • Trouble starting DAQ: rocps1 and rocps2 configuration files
  3. Reports:
  4. Longer Term Planning:
    • FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • TAC plans
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • During magnet ramp up: AC, diamond alignment,...
    • Controlled Access during Tuesday's RF recovery?
    • Harp scan after beam comes back?
    • Production data

Wednesday, February 28

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
    • Hall D Cavity BPMs
    • Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields
  4. Longer Term Planning:
    • FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • TAC plans
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Production data