(Thursday, February 22)
(Friday, February 23)
Line 32: Line 32:
  
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
+
#* Production data in last 24 hours: runs 41467 (400M), 41469 (138M), 41470 (400M), 41471
 +
#* Beam taken away 11:15-14:14 for linac issues
 +
#* Energy nudging - 3 times in last 24 hours
 +
# Issues:
 +
#* ADC in slot 16 of the TOF crate is still commented out in the config file
 +
#* [https://logbooks.jlab.org/entry/3536533 FDC TDC-ADC timing shifts]
 +
#* Are these issues?: [https://logbooks.jlab.org/entry/3536053 Problem starting run], [https://logbooks.jlab.org/book/halld ROCSTPSC2 and ROCTAGM2 have no events], [https://logbooks.jlab.org/entry/3536339 Power cycle the ROCTRIG2 and Start the DAQ again]
 +
# Reports (?):
 +
#* [https://logbooks.jlab.org/entry/3536349 position variations at top of Hall D ramp]
 +
#* [https://logbooks.jlab.org/entry/3536386 Beamline HarpScan]
 +
#* [https://logbooks.jlab.org/entry/3535706 Multi-scale active collimator calibration] any followup?
 +
# Planning:
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week7.jpg 100nA 10-4 radiator]
 +
#* [https://halldweb.jlab.org/DocDB/0035/003538/001/stevens_systematics.pdf Rate dependence, Flux, Polarization]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Harp scan at 7am
 +
#* Production data
 +
#* CDC delay reduced im FCAL_BCAL_PS_m9.conf for just one diamond run and then restore.
  
 
== Saturday, February 24  ==
 
== Saturday, February 24  ==

Revision as of 20:43, 22 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 22

  1. Notes from the previous 24 hours:
    • Continued production data until 1:30pm
    • Secretary Perry toured Hall D
    • Beam delivery shaky: Swing shift summary
    • DAQ/cMesg/rootSPY issues
    • Dipole trip
    • Transmission looks ok
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan once beam returns
    • Production data

Friday, February 23

  1. Notes from the previous 24 hours:
    • Production data in last 24 hours: runs 41467 (400M), 41469 (138M), 41470 (400M), 41471
    • Beam taken away 11:15-14:14 for linac issues
    • Energy nudging - 3 times in last 24 hours
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data
    • CDC delay reduced im FCAL_BCAL_PS_m9.conf for just one diamond run and then restore.

Saturday, February 24

  1. Notes from the previous 24 hours:


Sunday, February 25

  1. Notes from the previous 24 hours:


Monday, February 26

  1. Notes from the previous 24 hours:


Tuesday, February 27

  1. Notes from the previous 24 hours:


Thursday, February 28

  1. Notes from the previous 24 hours: