(Friday, February 23)
Line 56: Line 56:
  
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
+
#* Production data
 +
# Issues:
 +
#* ADC in slot 16 of the TOF crate is still commented out in the config file
 +
#* [https://logbooks.jlab.org/entry/3536533 FDC TDC-ADC timing shifts]
 +
# Reports (?):
 +
#* ROCSTPSC2 etc, any updates?
 +
#* [https://logbooks.jlab.org/entry/3537161 Beam position update]
 +
#* [https://logbooks.jlab.org/entry/3536973 Low level monitoring report]
 +
# Planning:
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week7.jpg 100nA 10-4 radiator]
 +
#* nA BPM commissioning: [https://halldweb.jlab.org/DocDB/0035/003538/001/stevens_systematics.pdf Rate dependence, Flux, Polarization]
 +
#* [https://logbooks.jlab.org/entry/3536915 Current timings], [https://logbooks.jlab.org/entry/3536858 CDC and FDC timings]
 +
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 +
#* Harp scan at 7am
 +
#* Production data
  
 
== Sunday, February 25 ==
 
== Sunday, February 25 ==

Revision as of 15:59, 23 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 22

  1. Notes from the previous 24 hours:
    • Continued production data until 1:30pm
    • Secretary Perry toured Hall D
    • Beam delivery shaky: Swing shift summary
    • DAQ/cMesg/rootSPY issues
    • Dipole trip
    • Transmission looks ok
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan once beam returns
    • Production data

Friday, February 23

  1. Notes from the previous 24 hours:
    • Production data
    • Beam taken away 11:15-14:14 for linac issues
    • Owl Shift Summary: rho, omega, phi triggers
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data

Saturday, February 24

  1. Notes from the previous 24 hours:
    • Production data
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data

Sunday, February 25

  1. Notes from the previous 24 hours:


Monday, February 26

  1. Notes from the previous 24 hours:


Tuesday, February 27

  1. Notes from the previous 24 hours:


Thursday, February 28

  1. Notes from the previous 24 hours: