(Sunday, February 25)
(Sunday, February 25)
Line 61: Line 61:
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
#* Production data
 
#* Production data
#* [https://logbooks.jlab.org/entry/3537405 CDC 160 ns shift], calibration, analysis
 
 
#* [https://logbooks.jlab.org/entry/3537708 Scan result for HALO]
 
#* [https://logbooks.jlab.org/entry/3537708 Scan result for HALO]
 
# Issues:
 
# Issues:
Line 79: Line 78:
 
#* Move collimator+beam
 
#* Move collimator+beam
 
#* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
 
#* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
#* CDC: bring window even closer, narrow its width? Revert to CDC integral mode.
+
#* [https://logbooks.jlab.org/entry/3537405 CDC 160 ns shift]: bring window even closer, narrow its width? Revert to CDC integral mode.
 
#* MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
 
#* MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
 
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:
 
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]:

Revision as of 10:40, 25 February 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, February 22

  1. Notes from the previous 24 hours:
    • Continued production data until 1:30pm
    • Secretary Perry toured Hall D
    • Beam delivery shaky: Swing shift summary
    • DAQ/cMesg/rootSPY issues
    • Dipole trip
    • Transmission looks ok
    • Production data
  2. Issues:
  3. Reports (?):
  4. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan once beam returns
    • Production data

Friday, February 23

  1. Notes from the previous 24 hours:
    • Production data
    • Beam taken away 11:15-14:14 for linac issues
    • Owl Shift Summary: rho, omega, phi triggers
  2. Issues:
  3. Reports (?):
  4. Planning:
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan at 7am
    • Production data

Saturday, February 24

  • No Hall D Counting Room meeting due to Collaboration Meeting

Sunday, February 25

  1. Notes from the previous 24 hours:
  2. Issues:
  3. Reports:
  4. Planning:
    • Move collimator+beam
    • 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
    • CDC 160 ns shift: bring window even closer, narrow its width? Revert to CDC integral mode.
    • MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
  5. Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
    • Harp scan in early morning
    • Production data

Monday, February 26

  1. Notes from the previous 24 hours:


Tuesday, February 27

  1. Notes from the previous 24 hours:


Wednesday, February 28

  1. Notes from the previous 24 hours: